Similar Projects
Randy Owen Performance Center - Jacksonville State University
New Construction, Infrastructure - 60,000 SF
Conception
$15,000,000 CJ est. value
Jacksonville, AL 36265

New Cypress Creek Wastewater Treatment Plant (WWTP) - City of Dothan
Infrastructure
Conception
$500,000 CJ est. value
Dothan, AL 36301

Lafayette Raw Water Intake, Pump Station, and Plant Modifications
Renovation, Infrastructure
Design
$500,000 CJ est. value
Lafayette, AL 36862

Lift Station 8 Improvements
Renovation, Infrastructure
Design
$300,000 CJ est. value
Guntersville, AL 35976

Material Exploitation Center (MEC) at Redstone Arsenal
Addition, Demolition, Infrastructure - 9,890 SF
Bidding
$250,000,000 CJ est. value
Redstone Arsenal, AL 35808

Material Exploitation Center (MEC) at Redstone Arsenal
Addition, Demolition, Infrastructure - 9,890 SF
Bidding
$250,000,000 CJ est. value
Redstone Arsenal, AL 35808

Meter Boxes and Lids for the Madison County Water Department
Term Contract
Post-Bid
Huntsville, AL 35811

Meadow Court / Avenue "Q" Ensley
Post-Bid
Birmingham, AL 35232

Craft Highway 20" Water Main
Results
Mobile, Prichard, AL

Site Improvements & Walkway Canopy at Daleville Middle School
Results
Daleville, AL 36322

Cannon Gate
New Construction - 1,300 SF
Construction
Opelika, AL 36801

Murphy Oil #6987/7817 / Semmes
Demolition, New Construction, Infrastructure - 1,400 SF
Construction
$2,000,000 CJ est. value
Semmes, AL 36575

The Taylor
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Opelika, AL 36801

ArchCo North Dean Road
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Auburn, AL 36830

Murphy USA #7171/7856 / Russellville
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Russellville, AL 35653

Last Updated 08/18/2022 11:32 PM
Project Title

Contract No. 2 - Labor Only - South Barron's Bridge Road South Area Project

Physical Address View project details and contacts
City, State (County) Dadeville, AL 36853   (Tallapoosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following: 10,120 LF 6" PVC Water Main PC 250 5,240 LF 3" PVC Water Main PC 250 180 LF 6" Welded Steel Encasement 40 LF 12" Welded Steel Encasement 9 EA 6" MJ Resilient Wedge Gate Valve 3 EA 3" MJ Resilient Wedge Gate Valve 3 EA 6" MJ Post Hydrant 4 EA 3" MJ Post Hydrant. All bids must be submitted in a sealed envelope bearing on the outside the name of the bidder, bidder's license number, address, and name of the project. Your Bid will be required to be submitted under a condition of irrevocability for a period of 60 days after submission. The Owner reserves the right to accept or reject any or all Bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents