Similar Projects
Generator Preventative Maintenance Services (Region 2)
Term Contract
Bidding
Daytona Beach, Jacksonville, Orlando, FL 32837

38Kv Vacuum Circuit Breakers
Bidding
Jacksonville Beach, FL

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

UPS Maintenance
Post-Bid
Jacksonville, FL 32212

Annual Electrical Services for City Buildings
Term Contract
Results
Less than $750,000 est. value
Jacksonville, FL

JTA Datacenter Uninterruptible Power Supply (UPS)
Results
Jacksonville, FL 32203

Jax Heights Tower Site Generator - Provision, Shipping and Testing
Bidding
Jacksonville, FL

Strobe/Led Lights: Flat and Pipe Mount
Term Contract
Post-Bid

Electrical Delivery Order Contracting Services
Results
Jacksonville, FL

Substation Battery Bank Testing and Inspection
Term Contract
Post-Bid
Jacksonville, FL 32202

Light Poles and Luminaires
Results
Jacksonville Beach, FL

Distribution Transformers
Term Contract
Post-Bid
Jacksonville Beach, FL

Steel Transmission Poles for the Circuit 830 Structures 30-32 and 42-44 Replacement
Results
Less than $113,912 est. value
Jacksonville, FL

Design Build Services for the Department of Health Generator Replacement Project
Post-Bid
Jacksonville, FL

Electrical Maintenance and Repair Services
Results
Jacksonville, FL 32218

Last Updated 06/03/2020 11:39 AM
Project Title

Isolated Phase Bus Clean and Inspect at Greenland Energy Center Units 61 and 62

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32256   (Duval County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This scope of work includes inspecting and cleaning both Isolated Phase Bus (IPB) systems between the GTE wall flex links and the step-up power transformers. The Bidder shall furnish all equipment, supervision, labor, transportation, tools and expendables to inspect, clean, and make repair recommendations, for the existing IPB. The purpose is to ensure that the duct, bus, flex-links and insulators are sufficiently clean and that the duct is properly sealed against moisture intrusion. If any equipment is found to be damaged, it will be up to the JEA Project Manager (PM) to decide if the equipment is to be left as-is, repaired or replaced. It is expected that any existing damage, corrosion or any other issue(s) that might have previously affected reliability, or issues that may affect reliability in the future be brought to the attention of the PM immediately. Prior to any work on the IPB, the Foreman shall walk down the clearance with the PM and Engineer to gain an understanding of JEA’s Lock Out Tag Out (LOTO) and to ensure safety prior to starting work. A daily meeting with the Contractor Foreman or Contractor PM shall be completed with the JEA PM to go over any safety issues, discovery, project status, and the project schedule

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents