Similar Projects
Wemsing Avenue - City Of Effingham
Infrastructure
Conception
$300,000 est. value
Effingham, IL 62401

East Evergreen Roadway Improvement - City Of Effingham
Infrastructure
Conception
$850,000 est. value
Effingham, IL 62401

Seal Coat
Infrastructure
Post-Bid
Effingham, IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Shoulder Work, Base Course Widening, Curb and Gutter, Ada Sidewalk Improvements and Box Culvert Replacement
Infrastructure
Results
IL

WestDale Project
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Effingham, IL 62401

Ford Avenue Extension Phase IB - City Of Effingham
Infrastructure
Conception
$1,400,000 est. value
Effingham, IL 62401

RFQ - Various Phase II District One Sign and Tower Structure Inspection Projects, Various Routes
Term Contract
Post-Bid
$250,000 CJ est. value
Springfield, IL 62703

RR-21-4821 Pavement Repairs
Infrastructure
Results

Fifth And Douglas Reconstruction - City of Effingham
Infrastructure
Conception
$475,000 est. value
Effingham, IL 62401

RFQ - Phase I/II Engineering Services for Reconstruction of Structure carrying IL 32/33 over I-57/70
Infrastructure
Post-Bid
$12,730,000 CJ est. value
Effingham, IL 62401

Pavement Patching-2021
Infrastructure
Results
Effingham, IL

Ford Avenue Extension Phase II - City Of Effingham
Infrastructure
Conception
$5,932,017 est. value
Effingham, IL 62401

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Last Updated 01/11/2023 08:32 AM
Project Title

Removal & Replacement of SN 025-0065 With HMA Resurfacing, Earthwork, Riprap, Guardrail, Pavement Marking, Etc. SN 025-0065 is Located on IL 128

Physical Address View project details and contacts
City, State (County) Beecher City, IL 62414   (Effingham County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,890,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project length is 0.17 miles. Removal and replacement of SN 025-0065 with HMA resurfacing, earthwork, riprap, guardrail, pavement marking, etc. SN 025-0065 is located on IL 128 over Big Moccasin Creek, 4.3 miles south of IL 33. Region 3 District 5 Federal Project # STP3USZ(044) County(s) Effingham Key Route(s) FAS 2801 Marked Route(s) IL 128 Section(s) (103BR)B-1 State Job #(s) C-97-030-09 PPS #(s) 7-50317-0000 VBP% 0.00 Completion Date : November 01, 2023 Plus 10 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 043 - Removal and Replacement of SN 025-0065 With HMA Resurfacing, Earthwork, Riprap, Guardrail, Pavement Marking, Etc. SN 025-0065 is Located on IL 128

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents