Similar Projects
Masonry Reconstruction - Ventilation
Bidding
Less than $100,000 est. value
Urbana, IL

Replace Mechanical Systems
Alteration
Bidding
Less than $5,000,000 est. value
Chicago Heights, IL 60411

N041--25 Ton Chiller Replacement
Post-Bid
North Chicago, IL

2B Cooling System Upgrade
Post-Bid
Romeoville, IL

HVAC Equipment Replacement
Results
Evanston, IL 60201

Boiler Replacement at Indian Trail JHS
Renovation
Results
Addison, IL 60101

Upgrade Laboratories
Renovation, Alteration
Bidding
Less than $400,000 est. value
Chicago, IL

Semi-Annual Duct, Hood and Fan Cleaning
Post-Bid
Wheaton, IL 60187

IVCC Building G AHU Replacement
Results
Oglesby, IL 61348

HVAC services
Alteration
Bidding
IL

HVAC Close Loop Water Test-Treat
Post-Bid
Belleville, IL 62225

Hot Water Heater Replacement
Results
Rock Island, IL 61201

Air Filters
Alteration
Bidding
$70,000 est. value
Chicago, IL

FSCC Chiller Maintenance
Post-Bid
Chicago, IL 60608

Chiller Bundle Repair and Replacement
Results
Chicago, IL 60622

Reported 07/13/2021 12:00 AM
Project Title

Common Area Furnace Replacement Civic Plaza I (High Rise)

Physical Address View project details and contacts
City, State (County) Rock Falls, IL 61071   (Whiteside County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect - 06/15/21
Owner View project details and contacts
Architect View project details and contacts
Description

A) Replace the existing furnace located in the basement level of Civic Plaza 1. Refer to attachments for location, specifications, and other general information. Basis of Design: Applied Air: model IF-75 or approved equal. B) Contract shall include but not limited to: disconnection of existing piping & ductwork, removal of existing unit, installation of new unit and reconnection and reworking of all piping and ductwork systems for the new unit. Refer to sheet M1.1 for total work both demolition and new work. C) Contractor shall only bid on this project if they can supply, install, and warranty the system listed on the invitation for bid. D) All existing electrical may be reused. Contractor to test wiring and verify that all new systems are operational at completion of project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents