Similar Projects
Site work for a golf course
Infrastructure
Conception
Longview, WA 98632

46th Avenue Construction - City of Longview
New Construction, Infrastructure
Conception
$3,650,000 est. value
Longview, WA 98632

Beacon Hill Reservoir
Infrastructure
Design
$300,000 CJ est. value
Kelso, WA 98626

SWR Breakaway Cable Terminal Replacement - Non-Interstates
Infrastructure
Design
$397,000 CJ est. value
Kelso, WA 98626

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Asphalt Crushing Services
Infrastructure
Post-Bid
Longview, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

West Scott Avenue and Davidson Avenue BNSF Water Main Crossings
Infrastructure
Results
$850,000 est. value
Woodland, WA 98674

Beech Street to Baltimore Water Main Replacements - City of Longview
Infrastructure
Conception
$350,000 est. value
Longview, WA

Mount Saint Helens Spirit Lake Intake Headwall
Infrastructure
Design
$20,000,000 CJ est. value
Cougar, WA 98603

Mount Saint Helens Sediment Retention Structure Crest Raise
Infrastructure
Bidding
$25,000,000 CJ est. value
Toutle, WA 98649

Kelso High School Practice Field Improvements
Infrastructure
Post-Bid
$320,000 CJ est. value
Kelso, WA 98626

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Last Updated 09/07/2022 12:36 PM
Project Title

South Fork McCorkle Creek Detention Structure Phase 1 Modifications

Physical Address View project details and contacts
City, State (County) Kelso, WA 98626   (Cowlitz County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,717,577 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed under this contract consists of the following: Providing all materials, equipment, and labor to install or construct vibrating wire piezometers and associated trenching/boring, vibration and noise monitoring, groundwater piezometers; groundwater control systems; approximately 900 linear feet of 12-inch diameter toe drain piping and storm drain manholes; chain link fencing and chain link gate; staff gauge, slide gate shaft replacement, approximately 400 linear feet of gravel access roadway; erosion and water pollution control; earthen dam modifications to include installation and compaction of ch imney drain systems, blanket drain systems and imported earth embankment dam material; site restoration; and all other work as specified herein and as shown on the drawings. All construction work is to be completed within 120 working days. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check,cashiers check, or surety bond in an amount equal to five percent (5%) ofthe amount ofsuch bid proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall to Contracting Agency The Contracting Agency reserves the right, to reject any and all bids and to waive any immaterial irregularities or informalities in any bid or in the bidding.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents