Similar Projects
Last Updated | 12/05/2018 07:37 PM |
Project Title | Renovation of Rest Room at Newtown Park |
Physical Address | View project details and contacts |
City, State (County) | Johns Creek, GA 30022 (Fulton County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Restroom/Bath House |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish and install all necessary materials, labor, tools, and supplies to complete Restroom Renovation Projects. 1. Project to include all materials, tools, supplies, storage, freight, design, and labor for the work to be completed. 2. Remove old countertops, sinks, faucets and associated fixtures. 3. Remove existing toilets, urinals, lavatories, and associated fixtures and accessories and reinstall. 4. Remove existing laminate partitions and hardware. 5. Remove existing wall, base, and floor tile. 6. The floor tile shall be replaced with new premium quality commercial tile. 7. Install new tile backer board and new wall and base tile to match existing tile coverage. Tile will cover the entire restroom, five feet up from the floor. Caulk all finish areas with premium quality minimum 15 year caulk. 8. Install new countertops, new under mount porcelain sinks, and new permanent powered commercial grade sensor faucets and soaps dispensers. 9. Replace the existing toilets and urinals. Supply new, hardwired commercial grade sensor flush valves for each. New toilet seats to be included for all toilets. 10. Install new solid partitions that are the same style and configuration as the existing. 11. Retrofit all fluorescent lighting fixtures to comparable LED lighting. 12. New LED wall fixtures to be supplied and installed. 13. New sensor lighting switches to be furnished and installed. 14. New sensor electric hand dryers to be supplied and installed for each restroom. 15. Paint the remainder of all all walls, ceilings, doors, and trim of the Men's and Women's restrooms. 16. New baby changing tables to be installed, including wall repairs, in all restrooms. 17. All carpentry, plumbing, electrical, painting, tile, and associated work necessary will be included in this project. Additional electrical circuits may be required: 1. Disposal of the old materials to be included. City to retain fixtures as needed. 2. Jobsite to be kept clean and restrooms to be professionally cleaned at the end of each work day 3. Supply new signage for each restrooms. 4. Provide a full 12 month warranty on materials, labor, and workmanship. | ||||||||||||||||
Details |
|
||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |