Similar Projects
Market Survey - Colorado Springs ATCT (Cos) Base Building Roof Replacement
Term Contract
Design
Colorado Springs, CO

Roof Replacement for Station 2
Post-Bid
Colorado Springs, CO 80921

Replacement of the Cast Iron Boiler and Burner Assembly at the Acacia Apartments
Post-Bid
Colorado Springs, CO 80903

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Hail Damage Repair at the Centennial Training Center
Results
Less than $2,325,000 est. value
Fort Carson, CO 80112

Emergency Roof Shoring
Construction
Palmer Lake, CO 80133

Roofing Envelope Services
Post-Bid

CTF SCF Boiler Deaeration Tank
Results
Less than $246,849 est. value
Colorado Springs, CO 80910

SCF DA Tank Docking Station Installation Bid Pack 2
Post-Bid
Less than $1,000,000 est. value
Colorado Springs, CO 80910

Facilities Roofing Repairs
Results
Less than $103,000 est. value
Colorado Springs, CO 80900

Cottonwood Creek Recreation Center Pool Boiler Replacement
Post-Bid
Colorado Springs, CO 80918

Solids Handling Energy Recovery Facility Roof System Replacement
Results
Fountain, CO 80817

Fire Station 4 and 13 Roof Replacement
Alteration
Post-Bid
Colorado Springs, CO 80906

Rock Ledge Ranch Roof Installation
Results
Colorado Springs, CO 80903

Colorado Springs Airport Building A Roof Replacement Project
Alteration
Post-Bid
Colorado Springs, CO 80916

Last Updated 09/09/2021 02:36 PM
Project Title

AFB 2141 CC 2018 Hail Damage Repairs

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Mechanical, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,800,000 to $4,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair and Replacement of Roofing System along with some equipment and fixtures located on the roofs at the Centennial Campus. Project consists of the repair and replacement of Roofing Systems and various identified mechanical and electrical pieces of equipment or fixtures on the College’s Centennial Campus. Work occurs on the following buildings and areas: A – Aspen Building B – Breckenridge Building C – Cheyenne Building F – Faculty Building BP – Old Boiler Plant CDC – Child Development Center Several Accessory Structures Parking Lot Lighting There are three (3) additive alternates to be bid with this project: #1. Alternate Roofing Systems #2. Additional Mechanical Equipment/Items to be replaced #3. Additional Roof Replacement at the CDC Building

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents