Similar Projects
Post Oak Drive Drainage Improvements
Post-Bid
Irving, TX 75060

White Rock Creek Basin Oaks North Drive Drainage Improvements
Post-Bid
Addison, TX 75254

Trench Drain Installation - Animal Care Campus
Results
Irving, TX 75038

Erosion Mitigation PGBT at Telecom Road
Results
$215,035 est. value
Garland, TX 75044

Lynn Creek Park Marina Slope Repair Improvements at the Oasis
Post-Bid
$307,000 est. value
Grand Prairie, TX 75050

Country Place Pond Improvements
Results
$470,265 est. value
Carrollton, TX 75006

Lagoon Embankment Restoration Project
Post-Bid
Dallas, TX 75200

Erosion Mitigation on PGBT at Campbell Road
Results
$191,940 est. value
Garland, TX 75044

Quail Creek Channel Repair
Post-Bid
Irving, TX 75014

Creek Restoration and FMA Management
Term Contract
Results
Dallas, TX 75201

Proposed Meadowcreek Drive Erosion Control Wall Improvements
Post-Bid
Duncanville, TX 75116

Gabion Erosion Control Structure Bee Ranch at 1201 Whispering Oaks
Results
$616,813 est. value
DeSoto, TX 75115

Crosby Road Tract Drainage Improvements and Crosby at Broadway Sidewalk Connection
Post-Bid
Carrollton, TX 75006

Pond Maintenance for Epic Central
Term Contract
Results
$37,200 est. value
Grand Prairie, TX 75050

Nimitz High School Drainage Improvement Project
Results
$236,877 est. value
Irving, TX 75060

Last Updated 02/21/2020 07:53 AM
Project Title

Cottonwood Creek Drainage Improvements at Marshall Drive and Robinson Road

Physical Address View project details and contacts
City, State (County) Grand Prairie, TX 75050   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,168,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of 137 linear feet of 4-9’x6’ box culvert and 3,210 square yards of roadway pavement consisting of Portland cement concrete pavement and asphaltic concrete pavement; relocation of a 12” city water line; construction of two 120-foot bridges spanning Cottonwood Creek; reconstructing 2,110 square yards of City-owned streets to new grades; excavating 23,900 cubic yards of material from Cottonwood Creek and installing permanent erosion control measures including grouted rock riprap, cast-in-place retaining wall, and erosion control matting.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents