Similar Projects
HVAC System Renovation Chancellors Hall - UW Eau Claire
Renovation
Sub-Bidding
$1,136,500 CJ est. value
Madison, WI 53715

Chilled Water Coil Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Madison, WI 53704

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Duct Cleaning Services
Alteration
Post-Bid
Chippewa Falls, Madison, Mauston, Oshkosh, Union Grove, WI 54901

Building One And Four Air Conditioning Installation GPC
Infrastructure, Alteration
Results
$1,247,800 est. value
Madison, WI 53704

HVAC Replacement
Alteration
Results
$931,000 est. value
Madison, WI 53704

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Refurbish Marley Cooling Tower
Alteration
Post-Bid
Madison, WI 53704

Ventilation Repairs
Alteration
Results
$210,000 est. value
Madison, WI 53705

Valve Boxes
Term Contract
Post-Bid
Madison, WI

2022 Library Rooftop Unit Replacement
Alteration
Results
Monona, WI

Air Filtration Installation
Alteration
Post-Bid
$133,000 est. value
Sun Prairie, WI

Environmental Health and Safety Central Utility Connections - GPC
Alteration
Results
$1,350,000 est. value
Madison, WI 53715

Cottage 7 HVAC Air Compressor Maintenace and Repair Services
Alteration
Post-Bid
Madison, WI

Environmental Health and Safety Central Utility Connections - MEP
Alteration
Results
$1,350,000 est. value
Madison, WI 53715

Last Updated 03/10/2023 04:33 PM
Project Title

A Tower Ventilation Renovation Witte Residence Hall MEP

Physical Address View project details and contacts
City, State (County) Madison, WI 53706   (Dane County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,958,124 [brand] Estimate
Plans Available from MEP Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

OWNER: State of Wisconsin, Department of Administration (DOA), Division of Facilities Development, hereinafter termed DFD All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website DFD Contractor Certification or upon request from DFD-- email dfdcertification@wisconsin.gov. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the 31 successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, 32 responsible, certified general prime contractor and this general prime contractor will enter into subcontracts 33 with the successful MEP bidders. US Mail or Third-party delivery (UPS, Fedex, or DHL) to State of Wisconsin, Administration Building, 7th Floor, 101 East Wilson Street, Madison, Wisconsin 53703; or Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703 In general, the work consists of ventilation improvements ot the Witte A Tower. Work includes installation of a new energy recovery unit, new supply and exhaust ductwork. Supporting work including general construction, electrical, fire protection and controls Plumbing 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements Base Bids will be received as a single lump sum bid for: 2) Fire Protection (Fire Suppression) 3) Bid Result. FIRE PROTECTION WORK:H.J. Pertzborn Plumbing & Fire Protection $86,351.00 PLUMBING WORK:H.J. Pertzborn Plumbing & Fire Protection $13,131.00 MECHANICAL WORK:Illingworth-Kilgust Mechanical, Inc. $1,310,000.00 ELECTRICAL WORK:Forward Electric, Inc. $548,642.00

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents