Similar Projects
Elmwood Estates Addition - City of Broken Arrow
Infrastructure
Conception
$312,000 est. value
Broken Arrow, OK

Turtle Creek Phase 2 - City of Broken Arrow
Alteration
Conception
$365,400 est. value
Broken Arrow, OK

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Pavement Striping
Infrastructure
Results
Owasso, OK 74055

2021 CIRP - North Asphalt Pavement Rehabilitation
Infrastructure
Results
Bixby, OK

South Boulder Avenue Office Renovation
New Construction, Infrastructure - 5,524 SF
Pending Verification
$1,076,738 CJ est. value
Tulsa, OK 74119

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

South Aspen Avenue Mixed Use Project Development
New Construction, Infrastructure - 260,000 SF
Conception
$132,000,000 CJ est. value
Broken Arrow, OK 74011

I-44 - Utilities
Infrastructure
Design
$2,013,883 CJ est. value
Tulsa, OK 74145

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Washington Street Improvements from Garnett Road to Olive Avenue
Infrastructure
Results
Broken Arrow, OK

Last Updated 02/15/2023 11:37 PM
Project Title

New Orleans Square - West New Orleans Street at South Elm Place Intersection and Streetscape Improvements

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74011   (Tulsa County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $3,981,318 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: ST1928 - NEW ORLEANS SQUARE - W. NEW ORLEANS ST. AT S. ELM PL. INTERSECTION AND STREETSCAPE IMPROVEMENTS: This project is located at the New Orleans Street and Elm Place intersection This project includes pavement reconfiguration, rehabilitation, and replacement of the New Orleans Street and Elm Place intersection. The new pavement configuration will include two through lanes in each direction along with dedicated left turn lanes at the intersection. Also, a dedicated right turn lane is included along north bound Elm Place for right turns onto east bound New Orleans Street. The proposed improvements include replacement of the interior intersection with a decorative full depth concrete pavement utilizing colored/patterned concrete and pavers. The existing asphalt pavement beyond the intersection proper will be milled and overlaid extending approximately 400 feet in each direction from the center of the intersection. The project also includes construction of approximately: 2,400 feet of 12" waterline; 2,200 feet of 5' wide concrete sidewalk; 600 feet of 10' wide concrete trail; medians; curbs and gutter; retaining walls; amenities; driveways; landscaping; hardscaping; irrigation; gateway features; street lighting; and traffic signal replacement. Total contract time for the project shall be Three Hundred (300) calendar days. Of this total calendar time, the first One Hundred Eighty (180) calendar days are dedicated specifically to substantial completion of the roadway construction between, and including, the curbs. The remaining One Hundred Twenty (120) calendar days are dedicated to; substantial completion of the remaining project (i.e. sidewalks, trails, landscaping, lighting, irrigation, gateways, amenities, retaining walls, and hardscaping located behind the curb line). It is anticipated that acquisition of some amenities, traffic signal and lighting components may take from Forty (40) to Fifty-Two (52) weeks after notice to proceed. Required Project Milestones: o May 17th, 2022 - Award construction contract by City Council o May 25th, 2022 - Pre-work meeting o June 1st, 2022 - Commence construction (contractor on site) o November 28th, 2022 -Substantial completion of roadway (180 days)* o March 28th, 2023 - Substantial completion remainder of project (120 days)* *Substantial completion shall be considered to account for material supply chain delays (including: some amenities, traffic signal and light components, etc.) Est. Value Notes:$4,200,000. St1928 - new orleans square - w. new orleans st. at s. elm pl. intersection and streetscape improvements: this project is located at the new orleans street and elm place intersection. for this project, bids will only be received and accepted via the online electronic bid service through questcdn.com. all required affidavits and proposal guarantees must be submitted through questcdn. Due to social distancing requirements of the COVID-19 health crisis, bidders and other members of the public may attend and view the bid opening only through the following online access: Broken Arrow, City of "Virtual Bid Openings" or by "control clicking" on the following link: Virtual bid openings | Broken Arrow, OK. The bid opening will be live-streamed and recorded. Sworn statement of the Bidder's assets and liabilities, technical qualifications and performance in the form of the latest annual report and financial statement are not required to be submitted with the Bidder's Proposal, but City of Broken Arrow may require such statements prior to award of the construction contract. Both the Statement of Qualifications & Experience and the Statement of Key Personnel Qualifications & Experience, using the forms found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in the City of Broken Arrow considering the Bid non-responsive and result in rejection of the Bid by the City of Broken Arrow. Bidders may be required to provide supplemental information if requested by the City of Broken Arrow to clarify, enhance or supplement the information provided in the Statement of Qualifications & Experience and/or the Statement of Key Personnel Qualifications & Experience. The apparent successful Bidder shall, within two (2) days after Bid opening, submit to City of Broken Arrow a list of the Subcontractors, Suppliers, individuals or entities proposed for the following portions of the Work: waterline, asphalt, and decorative concrete work. Such list shall be accompanied by a Statement of Qualifications & Experience as well as a Statement of Key Personnel Qualifications & Experience, using the forms found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If City of Broken Arrow or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, City of Broken Arrow may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. If apparent Successful Bidder declines to make any such substitution, City of Broken Arrow may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by the City of Broken Arrow, submit to City of Broken Arrow the above required list of the Subcontractors, Suppliers, and other individuals or entities. In evaluating whether a Bidder is responsible, City of Broken Arrow will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided above. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to the City of Broken Arrow. The successful Bidder must, within five (5) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by City of Broken Arrow in the amounts equal to the Contract price. Complete digital project documents are available at Broken Arrow, City of - Bidding Information" by "control clicking" on the above link: and/or QuestCDN Contact QuestCDN Customer Support at 952-233-1632 or info@questcdn.com for assistance in membership registration, downloading digital project information and vBid online bid submittal questions. Project bid documents must be downloaded from QuestCDN which will add your company to the Planholder List and allow access to vBid online bidding for the submittal of your bid (which is required for this project). Bidders will be charged a fee of $30 to submit a bid electronically.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents