Similar Projects
Roof Replacment and Repair Services
Bidding
Charlotte, NC

Providence High School Phase II Roof Replacement
Bidding
Charlotte, NC 28270

Blumenthal Performing Arts Center (PAC) Roof Replacement - Lower Level
Post-Bid
Less than $469,000 est. value
Charlotte, NC 28202

MRF Roof Repair
Post-Bid
Charlotte, NC 28215

145th CE Repair Roofing Project for Building 51 & 5
Results
$500,000 to $1,000,000 est. value
Charlotte, NC 28208

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Butler High School Phase II Roof Replacement
Bidding
Matthews, NC 28105

Snoopy Hangar Roof Replacement and Repairs
Post-Bid
Charlotte, NC 28208

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Windsor Park Elementary School Roof Replacement
Bidding
Charlotte, NC 28205

Roofing MACC
Post-Bid

South Charlotte Middle School Roof Replacement
Results
$601,400 est. value
Charlotte, NC 28277

Spaugh Middle School Areas A1-A4 Roof Replacement
Bidding
Charlotte, NC 28208

Roofing Repair and Maintenance
Post-Bid

Butler High School Phase I Roof Replacement
Results
$837,450 est. value
Matthews, NC 28105

Last Updated 02/26/2020 11:47 AM
Project Title

Charlotte-Mecklenburg Government Center (CMGC) Upper Roof Recover

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28202   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $484,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work in the upper roof sections includes the provision of all labor, material, equipment, supervision and administration to include: 1. Remove and dispose of the existing roof flashings and sheet metal down to the existing modified bitumen roof membrane to remain, 2. Replace wet insulation and roof membrane in accordance with unit prices and quantity allowances, 3. Fully adhere two-ply modified bitumen roof membrane in cold-process, low VOC adhesive along with flashings and accessories, 4. Replace sheet metal flashings and trim, and 5. Provide a complete, watertight, 20-year warrantable roof assembly.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents