Similar Projects
Last Updated | 08/22/2022 12:02 PM |
Project Title | 2022 University Avenue Biocell Project |
Physical Address | View project details and contacts |
City, State (County) | Cedar Falls, IA 50613 (Black Hawk County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $103,445 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This work shall consist of furnishing and installing four bio-retention cells located along the University Avenue corridor which will include placement of 6 inch diameter storm sub-drains, placement of four modified storm sewer intakes, subdrain clean outs, curb and gutter replacement, engineered soil placement, and a variety of native plantings. The City of Cedar Falls reserves the right to reject any and all proposals including without limitation, nonconforming, nonresponsive, unbalanced, or conditional bids. The work under the proposed contract shall commence within ten (10) calendar days after the date set forth in the written Notice to Proceed and shall be performed regularly and diligently throughout the duration of the project. The Contractor shall fully complete the project no later than October 28 th , 2022. Liquidated damages in the amount of $800 per calendar day shall be assessed for each calendar day that work remains uncompleted after the completion date. Each Form of Proposal shall be accompanied in a separate envelope by a proposal guaranty as defined in Division 1 Section 05. A scanned copy of the Bid Bond must be included with the online bid submitted at website. Performance and Payment Bonds: The successful Bidder shall furnish to the City a performance bond in an amount equal to one hundred percent (100%) of the contract price, guaranteeing faithful performance of the contract and guaranteeing the completed project against defective workmanship and materials for a period of two (2) years from and after completion and acceptance by the City. The successful Bidder shall also provide a payment bond in an amount equal to one hundred percent (100%) of the contract price guaranteeing payment of all persons supplying labor and material, or both, in the execution of the work provide for in the contract. If any prospective bidder is in doubt as the true meaning of any parts of the contract documents, the bidder may request an interpretation from the Engineer, in writing, through email. Questions received less than five (5) days prior to the date for opening bids may not be answered. Contact individuals shall be as follows: Brett Armstrong Civil Engineer I 319-268-5163 220 Clay Street Cedar Falls, Iowa brett.armstrong@cedarfalls.com |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |