Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 est. value
Cedar Falls, IA

Industrial Park Expansion (Phase I) - 5 - City of Cedar Falls
Alteration
Conception
$6,000,000 est. value
Cedar Falls, IA 50613

Main Street Reconstruction - City of Cedar Falls
Infrastructure
Design
$12,025,000 est. value
Cedar Falls, IA 50613

Cedar River Safety and Recreational River lmprovements Phase I - City of Cedar Falls
Infrastructure
Design
$4,831,000 est. value
Cedar Falls, IA

2022 Hammond Avenue at Sink Creek Water Main Relocation Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Waterloo, IA 50701

2022 Hammond Avenue at Sink Creek Water Main Relocation Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Waterloo, IA 50701

Cedar Falls High School Natatorium
New Construction, Infrastructure - 37,000 SF
Sub-Bidding
$13,400,000 CJ est. value
Cedar Falls, IA 50613

FY 2022 Asphalt Overlay Program
Infrastructure
Post-Bid
Waterloo, IA

FY 2022 Sidewalk Repair Program - Zone 2
Infrastructure
Post-Bid
$90,000 est. value
Waterloo, IA

Rotary Reserve Access Lane and Parking Lot Resurfacing
Infrastructure
Results
Waterloo, IA

Rotary Reserve Access Lane and Parking Lot Resurfacing
Infrastructure
Results
Waterloo, IA

Union at North Crossing
New Construction, Infrastructure
Pending Verification
$68,000,000 CJ est. value
Waterloo, IA 50703

Aikey Auto Salvage Storage Building
New Construction, Infrastructure - 5,200 SF
Pending Verification
$560,000 CJ est. value
Waterloo, IA 50703

Downtown Lot Improvements - City of Cedar Falls
Alteration
Conception
$300,000 est. value
Cedar Falls, IA 50613

Top Notch Tile & Construction Office and Warehouse
New Construction, Infrastructure
Design
$500,000 CJ est. value
Waterloo, IA 50701

Last Updated 08/22/2022 12:02 PM
Project Title

2022 University Avenue Biocell Project

Physical Address View project details and contacts
City, State (County) Cedar Falls, IA 50613   (Black Hawk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $103,445 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This work shall consist of furnishing and installing four bio-retention cells located along the University Avenue corridor which will include placement of 6 inch diameter storm sub-drains, placement of four modified storm sewer intakes, subdrain clean outs, curb and gutter replacement, engineered soil placement, and a variety of native plantings. The City of Cedar Falls reserves the right to reject any and all proposals including without limitation, nonconforming, nonresponsive, unbalanced, or conditional bids. The work under the proposed contract shall commence within ten (10) calendar days after the date set forth in the written Notice to Proceed and shall be performed regularly and diligently throughout the duration of the project. The Contractor shall fully complete the project no later than October 28 th , 2022. Liquidated damages in the amount of $800 per calendar day shall be assessed for each calendar day that work remains uncompleted after the completion date. Each Form of Proposal shall be accompanied in a separate envelope by a proposal guaranty as defined in Division 1 Section 05. A scanned copy of the Bid Bond must be included with the online bid submitted at website. Performance and Payment Bonds: The successful Bidder shall furnish to the City a performance bond in an amount equal to one hundred percent (100%) of the contract price, guaranteeing faithful performance of the contract and guaranteeing the completed project against defective workmanship and materials for a period of two (2) years from and after completion and acceptance by the City. The successful Bidder shall also provide a payment bond in an amount equal to one hundred percent (100%) of the contract price guaranteeing payment of all persons supplying labor and material, or both, in the execution of the work provide for in the contract. If any prospective bidder is in doubt as the true meaning of any parts of the contract documents, the bidder may request an interpretation from the Engineer, in writing, through email. Questions received less than five (5) days prior to the date for opening bids may not be answered. Contact individuals shall be as follows: Brett Armstrong Civil Engineer I 319-268-5163 220 Clay Street Cedar Falls, Iowa brett.armstrong@cedarfalls.com

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents