Similar Projects
Kenneth D. Bailey Academy Expansion
Addition
Conception
Danville, IL 61832

Egyptian School - Locker Room Renovation
Renovation
Bidding
$500,000 est. value
Tamms, IL 62988

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Phase IV Group 5
Results
Chicago, IL

Interior Renovations
Results
Less than $120,000 est. value
Akin, IL

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

LIFT Innovation Center
Renovation - 49,700 SF
Construction
Mattoon, IL 61938

Maine South High School
Post-Bid
Park Ridge, IL

Interior Renovations at Lake Zurich High School - Bid Release 1
Results
Lake Zurich, IL

2021 Renovation Work
Renovation
Post-Bid
Less than $4,500,000 est. value
North Chicago, IL 60064

McHenry West High School - 2021 Pavement Maintenance
Results
McHenry, IL 60050

Summer 2021 Improvements at Palombi MS
Post-Bid
Lake Villa, IL

Richwoods High School Science Lab Renovation Phase II
Renovation
Results
Peoria, IL 61614

Skinner North and Hawthorn ROF
Post-Bid
Less than $8,600,000 est. value
Chicago, IL

Reported 06/03/2022 12:00 AM
Project Title

Quest Charter Restroom Renovations Project located at Both the High School and Middle School

Physical Address View project details and contacts
City, State (County) Peoria, IL   (Peoria County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $245,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of upgrades to the plumbing fixtures at both school restrooms and teachers workrooms. Other work is new toilet partitions, exhaust fans, electric water coolers and associated electrical and interior finishes. Bid shall be held good and not withdrawn for sixty (60) calendar days from the date of bid opening. All requests for clarifications or interpretations outside the Pre-Bid Conference shall be made to the Architect in writing and will be answered by Addendum when appropriate. Commencement of the work on the project shall be subject to the discretion of Quest Charter Academy, Peoria, Illinois. The Owner reserves the right to waive any irregularities and to accept any or reject all bids when in the opinion of the Owner, such action will serve the best interest of the Owner.

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents