Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

MA-ALDOT Statewide HVAC
Term Contract
Post-Bid

Z--Project 619-17-102 Replace AHU Building 1
Results
$500,000 to $1,000,000 est. value
Montgomery, AL 36109

MA - Maintenance Service of HVAC Equipment
Term Contract
Results
Montgomery, AL

Weatherization Assistance Program (WAP)
Post-Bid

Building Chiller Renovation
Results
Less than $553,200 est. value
Montgomery, AL

Chiller Replacement
Post-Bid
Montgomery, AL

MA-DHR- HVAC Preventative Maintenance Services
Results
Bessemer, Montgomery, AL

Maxwell AFB Electric Heating Furnace
Post-Bid
Maxwell Afb, AL

Heating, Air Conditioning and Refrigeration Board Exam
Results
AL

Capitol HVAC Repair and Controls Upgrade Capitol Operations
Post-Bid
Less than $850,000 est. value
Montgomery, AL 36130

IDIQ JOC HVAC Phase 2
Results
Less than $500,000 est. value

73--Central Alabama Veterans Health Care System Tuskegee/Montgomery Quarterly Range Hood Cleaning
Post-Bid
Montgomery, AL

MA-Heating, A/C, and Plumbing Repairs
Results
Montgomery, AL 36109

HVAC System Renovation and Upgrades for Jeff Davis High School - Phase 2
Post-Bid
Montgomery, AL

Last Updated 03/21/2019 01:03 PM
Project Title

Replacement 20 Ton Split HVAC Unit at Montgomery Studio

Physical Address View project details and contacts
City, State (County) Montgomery, AL   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Labor and materials to replace a 20-ton split HVAC unit at APT's Broadcast Studio building located 1255 Madison Avenue, Montgomery, Alabama. Remove and properly dispose of old 20-ton units both indoor and outdoor. Install new 20-ton split system. Modify existing duct work, electrical and control wiring to work with new unit. Price shall include all labor and materials to complete the job. It shall be necessary to remove a portion of the inside wall along with an inside door in order to remove the old indoor unit and install the new indoor unit. Wall and door shall be put back in its original condition. HVAC units shall be brand new. All permits required to complete the installation is the responsibility of the successful bidder.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents