Similar Projects
Montessori School
Addition - 470 SF
Conception
Bridgeville, PA 15017

New Lewis C. Cassidy Elementary School
New Construction
Conception
$30,000,000 est. value
Philadelphia, PA

Ethan Allen Elementary School Major Renovation & Addition
Renovation, Addition
Design
Philadelphia, PA

James Rhoads Elementary School Major Renovations
Renovation
Design
Philadelphia, PA 19139

Addition And Major Renovation At Rhawnhurst Elementary School - General
Renovation, Addition - 60,712 SF
Bidding
$12,518,021 est. value
Philadelphia, PA

Renovations and Addition to Aronimink Elementary School General Construction
Renovation, Addition - 16,762 SF
Bidding
$23,730,000 est. value
Drexel Hill, PA 19026

Renovations To Northside Elementary - Phase 2
Renovation
Post-Bid
Palmyra, PA 17078

Interior Alterations at Mariana Bracetti Academy Charter School`s Annex
Renovation
Post-Bid
Philadelphia, PA 19124

Upper Allen Elementary School Additions & Renovations
Renovation
Results
$6,000,000 est. value
Mechanicsburg, PA 17055

Gill Hall Elementary School
Results
Less than $8,059,332 est. value
Jefferson Hills, PA 15025

Waldorf School of Pittsburgh
New Construction - 1,300 SF
Construction
$400,000 est. value
Pittsburgh, PA 15224

Franklin Elementary School Renovations and Additions
Renovation, Addition
Construction
Sewickley, PA 15143

Anne Frank Elementary School Addition & Renovation
Renovation, Addition
Design
Philadelphia, PA

Equipment Installation
Renovation
Post-Bid
Allentown, PA 18109

New Security Entrances - General Construction
Results
Pittsburgh, PA 15202

Reported 10/05/2020 01:47 PM
Project Title

Watson Institute Expansion

Physical Address View project details and contacts
City, State (County) Sewickley, PA 15143   (Allegheny County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method
Project Status Construction Commenced June 2020
Bids Due View project details and contacts
Estimated Value $9,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Elementary School, Addition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents