Similar Projects
Bridge Reconstruction Program - 11086 - City of Sioux Falls
Demolition, New Construction, Infrastructure
Conception
$14,585,000 CJ est. value
Sioux Falls, SD 57104

Bridge Reconstruction Program - 11086 - City of Sioux Falls
Demolition, New Construction, Infrastructure
Conception
$14,585,000 CJ est. value
Sioux Falls, SD 57104

Arrowhead Parkway Improvements - 11064 - City of Sioux Falls
Infrastructure
Design
$9,410,000 est. value
Sioux Falls, SD 57110

Dance Gallery / Sioux Falls
New Construction, Infrastructure - 20,000 SF
Design
$5,000,000 CJ est. value
Sioux Falls, SD 57105

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Willow Avenue Improvements
Infrastructure
Results
$664,000 est. value
Sioux Falls, SD 57104

WholeStone Farms Pork Harvesting And Processing Facility
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Sioux Falls, SD 57104

1st Avenue Mixed Use Development
New Construction, Infrastructure - 5,000 SF
Pending Verification
$28,000,000 CJ est. value
Sioux Falls, SD 57104

RR Grade Separation, CE
Infrastructure
Conception
$10,000,000 CJ est. value
Sioux Falls, SD 57107

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Structure 332 Steel Girder , Gravity Large Concrete Block Wall
Infrastructure
Results
SD

Water Reclamation Facility (WRF) Improvements and Expansion Project
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$159,000,000 CJ est. value
Sioux Falls, SD 57104

Interchange Reconstruction
Infrastructure
Conception
$50,978,000 CJ est. value
Sioux Falls, SD 57103

Last Updated 04/29/2023 03:01 AM
Project Title

3rd Street Improvements

Physical Address View project details and contacts
City, State (County) Dell Rapids, SD 57022   (Minnehaha County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,989,177 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

3rd Street Improvements (SD HWY 115 to Orleans Ave.) Concrete Pavement, Utility Street Construction and Excavation The Project shall consist of the following work and approximate quantities and kinds of materials: Unclassified Excavation 17,000 CY Rock Excavation 2,420 CY Base Course 22,190 Ton Asphalt Concrete Composite 2,000 Ton 9" Nonreinforced Concrete Pavement 12,280 SY Concrete Fillets 480 SY Concrete Driveway/Approach 2,044 SY Concrete Sidewalk 41,760 SF Storm Sewer 4,700 LF Sanitary Sewer and Services 5,000 LF Water Main and Services 5,470 LF Class M6 Concrete 150 CY Reinforcing Steel 19,910 LB

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents