Similar Projects
New Fire Station - Washington
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Washington, MO 63090

New Fire Station - Washington
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Washington, MO 63090

Highway 47 and Highway 50 Intersection Development
Alteration
Design
$5,300,000 est. value
Union, MO 63084

Agricultural Building - Union R-XI School District
New Construction, Infrastructure - 20,000,000 SF
Design
$5,400,000 CJ est. value
Union, MO 63084

Resurface - Route AC
Infrastructure
Bidding
$1,000,000 CJ est. value
Boone Township, MO 63056

Resurface - Route AC
Infrastructure
Bidding
$1,000,000 CJ est. value
Boone Township, MO 63056

Union R-XI High School Greenhouse Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$75,000 CJ est. value
Union, MO 63084

Concrete Proposal
Infrastructure
Post-Bid
$800,000 CJ est. value
Berger, MO 63014

Kitchell Avenue Improvements
Infrastructure
Results
Saint Clair, MO 63077

Bush Creek Greenway Improvements Project
Infrastructure
Results
Washington, MO

Lux Living South Kingshighway Boulevard Mixed-Use
Demolition, New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Lux Living South Kingshighway Boulevard Mixed-Use
Demolition, New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Old Pool Renovation - Washington
Renovation, Infrastructure
Conception
$389,000 CJ est. value
Washington, MO 63090

Aurora Estates Senior Living
New Construction, Infrastructure
Design
$11,200,000 CJ est. value
Pacific, MO 63069

Resurfacing, Bridge Replacement, Guard Rail and ADA
Demolition, New Construction, Infrastructure
Post-Bid
$18,000,000 CJ est. value
Saint Clair, MO 63077

Last Updated 08/17/2023 12:31 PM
Project Title

Westlink Drive Improvement Project

Physical Address View project details and contacts
City, State (County) Washington, MO 63090   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $541,315 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes edge milling on Westlink Drive for a two inch asphalt overlay from Bluff Road to Main Street with striping, and new right turn lane reconstruction at Westlink Drive on to Bluff Road. Each bid, and accompanying bid security in the form of a Bid Bond, Cashier's Check or a Certified Check in the amount of 5%. Payment and performance bonds are not required for projects estimated to cost less than $50,000.00. The DBE Goal for this project is 10%. The City Council of said City with approval from the Missouri Department of Transportation reserves the right to reject any and/or all bids, and to waive any irregularities therein. All questions concerning this project during the bidding process shall be forwarded to the project contact listed below: John Nilges, P.E. 405 Jefferson Street, Washington, MO 636-390-1010 jnilges@washmo.gov

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents