Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

Waterfront East
Demolition, LEED Certification, New Construction, Infrastructure - 300,000 SF
Conception
$100,900,000 CJ est. value
Vancouver, WA 98661

Fruit Valley Modernization
Build-out, Renovation, Infrastructure
Design
$4,754,309 CJ est. value
Vancouver, WA 98660

Fruit Valley Modernization
Build-out, Renovation, Infrastructure
Design
$4,754,309 CJ est. value
Vancouver, WA 98660

NB Fourth Plain On Ramp SB 134th St To Mill Plain Ramp Meters
Infrastructure
Bidding
$4,000,000 CJ est. value
Ridgefield, WA 98642

NB Fourth Plain On Ramp SB 134th St To Mill Plain Ramp Meters
Infrastructure
Bidding
$4,000,000 CJ est. value
Ridgefield, WA 98642

N 6th St/ N 8th St Concrete Pavement Repair Project
Infrastructure
Post-Bid
Washougal, WA 98671

Westside WWT Backflow Prevention Improvement
Infrastructure
Post-Bid
Vancouver, WA 98660

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Royle Road S 19th to 460 LF N of S 15th
Infrastructure
Results
$2,350,000 est. value
Ridgefield, WA 98642

119th Cottages
New Construction, Infrastructure
Pending Verification
$18,400,000 CJ est. value
Vancouver, WA 98686

119th Cottages
New Construction, Infrastructure
Pending Verification
$18,400,000 CJ est. value
Vancouver, WA 98686

NE 90th Circle Apartments
New Construction, Infrastructure
Conception
$27,500,000 CJ est. value
Vancouver, WA 98665

Westside Wastewater Treatment Facility (WWTF) Backflow Prevention Improvements
Infrastructure
Design
$95,500 CJ est. value
Vancouver, WA 98660

Replacement of the Current Evergreen School District Transportation Facility
New Construction, Infrastructure
Bidding
$17,500,000 CJ est. value
Vancouver, WA 98682

Last Updated 11/30/2022 02:20 PM
Project Title

NW 36th Ave Just South of Salmon Creek

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98685   (Clark County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $23,956 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of digging up an existing sewer main, cutting out a 10’ section of damaged sewer main, and replacing it with PVC pipe of the same size.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents