Similar Projects
Woodville Road Widening Phase 1 - Old Hearne to Texas Avenue - ST_ 15_ 001 - City of Bryan
Infrastructure
Conception
$5,440,000 CJ est. value
Bryan, TX 77803

Old Hearne Reconstruction (Wilkes to Woodville) Phase 3 and 5 - ST_ 11_ 002/ST_ 11_ 003 - City of Bryan
Infrastructure
Conception
$4,400,000 CJ est. value
Bryan, TX 77803

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Villa Maria C Store
New Construction, Infrastructure - 3,971 SF
Design
$1,000,000 CJ est. value
Bryan, TX 77807

BTU Administration Office
New Construction, Infrastructure - 37,000 SF
Post-Bid
$20,000,000 CJ est. value
Bryan, TX 77808

Texas A and M Business Education Complex
New Construction, Infrastructure
Post-Bid
$54,023,000 CJ est. value
College Station, TX 77845

Borlaug Center Renovation and Addition
Renovation, Addition - 85,000 SF
Results
College Station, TX

JP/Constable Precinct 1 Building Site Work
Infrastructure
Results
$605,021 est. value
TX

Kent Moore Cabinets Phases 3-A & 3-B
Addition - 41,362 SF
Construction
Bryan, TX 77803

Dutch Bros Coffee - University Drive (TX0305) / College Station
New Construction, Infrastructure - 930 SF
Construction
$500,000 CJ est. value
College Station, TX 77840

Pine Ridge Apartments
New Construction, Infrastructure - 13,571 SF
Pending Verification
$1,500,000 CJ est. value
College Station, TX 77840

Crossway Auto Center
New Construction, Infrastructure - 2,903 SF
Pending Verification
$246,755 CJ est. value
Bryan, TX 77808

WS Phillips Pkwy - GP Rd to Barron Rd Cut Off - City of College Stations
Infrastructure
Conception
$7,800,000 CJ est. value
College Station, TX 77845

Hansen-Zak
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Bryan, TX 77801

CTE Complex Gate for the Bryan Independent School District
Infrastructure
Post-Bid
$120,000 CJ est. value
Bryan, TX 77807

Last Updated 05/24/2023 08:40 AM
Project Title

RFQ - Design/Build Services for Lake Bryan Maintenance Shop

Physical Address View project details and contacts
City, State (County) Bryan, TX 77807   (Brazos County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected March 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 24, 2023, this project has been canceled and will be reposted at a later date. Deadline for Questions May 19, 2023 @ 10:00am. Design/Build Services for Lake Bryan Maintenance Shop - Design and Construction of a 75'x30' maintenance shop with an internal office, restroom and storage space at Lake Bryan Location- 8200 Sandy Point Road, Bryan, TX 77807. Completion of the Project No later than December 1, 2023

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents