Similar Projects
Rehabilitation Of Sanitary Sewer Lift Station At Concourse B, IAD
Renovation
Bidding
$250,000 to $300,000 est. value
Dulles, VA

Glenmore Water Resources Recovery Facility (WRRF) Influent Pump and VFD Addition
New Construction
Bidding
Keswick, VA 22947

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Crozet Flow Equalization Tank and Pumping Station Upgrade
Post-Bid
Charlottesville, VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Johnson Creek Wastewater Pump Station
Results
$8,067,444 est. value
Chester, VA 23836

Smith Farms Sanitary Sewage Pump Station
New Construction
Construction
$75,000 est. value
Yorktown, VA 23693

Construct Pump Station
New Construction
Bidding
Burkeville, VA

Pump Station 23 Service Area Phase 8
Post-Bid
Norfolk, VA

Construction of Arts and Conference Center Pump Station 114
Results
$1,000,000 to $2,999,999 est. value
Virginia Beach, VA 23456

Kings Trail Pump Station 234 Replacement
Post-Bid
Virginia Beach, VA

Oak Forest Pump Station Abandonment Project
Results
$959,491 est. value
Charlottesville, VA 22900

Langley School Pump Station and Force Main
Post-Bid
$3,400,000 est. value
McLean, VA 22101

Rady Park Pump Station Replacement
Results
Warrenton, VA

Construction of Lake Front Village Pump Station 309 Replacement
Post-Bid
Virginia Beach, VA 23456

Last Updated 06/23/2021 12:44 PM
Project Title

Pump Station 50 and 67 Rehabilitation

Physical Address View project details and contacts
City, State (County) Suffolk, VA 23434   (Suffolk City County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,350,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, equipment, and incidentals as identified in Section 01010 (Summary of Work) of the Contract Documents to complete the rehabilitation of existing Pump Station Numbers 50 and 67.

Details

Lift and Pump Stations, Renovation, 1 Lift and Pump Stations, Approximately 515 SF Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 11 - Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents