Similar Projects
2022 MFT Resurfacing Project
Term Contract
Bidding
$1,409,000 est. value
Sycamore, IL

Topsoil and Seeding, AGG Base Repair, HMA Surf Rem
Infrastructure
Bidding
$500,000 est. value
Sycamore, IL 60178

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Pavement Upgrades
Post-Bid
Malta, IL 60150

Resurfacing, Sidewalks, Curb and Gutter, Pavement Markings
Results
Genoa, IL 60135

2021 Crack Routing and Filing
Results
Less than $40,968 est. value
De Kalb, IL

2022 Streets Program Bid Package 2
Infrastructure
Bidding
$2,000,000 est. value
Dekalb, IL

2021 General Road Materials
Post-Bid
De Kalb, IL

DeKalb Streets 2021
Results
Less than $1,295,960 est. value
IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

HMA Overlay
Results
$55,631 est. value
Kingston, IL

Roadway Improvements
Infrastructure
Post-Bid
Dekalb, IL 60115

HMA Overlay
Results
$314,115 est. value
Sycamore, IL

Aluminized PC, Type 1, Various Size - Total 2112 Feet / Aluminized PC, Type 1, Connecting Band - Total 29 Each.
Infrastructure
Post-Bid
De Kalb, IL

HMA Overlay
Results
$100,000 to $500,000 est. value
Hinckley, IL

Reported 05/13/2022 12:00 AM
Project Title

2022 Streets Project

Physical Address View project details and contacts
City, State (County) Kirkland, IL   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids. Bids by Invitation.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes pavement removal, new hot-mix asphalt paving, storm sewer installation, sidewalk removal and replacement, curb & gutter, traffic control, and other related appurtenances within the Village limits. The project is approximately 11,500 feet of roadway reconstruction and approximately 3,300 feet of storm sewer installation. The work is located within the boundaries of the Village of Kirkland, Illinois. The project includes pavement removal, new hot-mix asphalt paving, storm sewer removal and installation, sidewalk removal and replacement, curb and gutter installation, traffic control, restoration, and other related work within the Village limits. The project is located on the following streets: - West South Street from South 6th Street to 1st Street - West Prairie Street from South 6th Street to South 3rd Street - West Prospect Street from South 6th Street to South 4th Street - West Benham Street from South 5th Street to South 3rd Street - Hortense Drive from Bull Run Creek to 1st Street -South 5th - 2nd Street from IL-72 to West South Street

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents