Similar Projects
Non-Potable Reservoir Pump Station
Post-Bid
Brighton, CO 80601

Marcy Gulch Lift Station Project
New Construction
Post-Bid
Highlands Ranch, CO 80129

Lift Station Pump Replacement
Results
Denver, CO 80202

Smoky Hill Pump Station Improvements
Results
$3,200,000 to $3,670,000 est. value
Aurora, CO 80012

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

Binney Connection Project Treatment and Pumping Package
New Construction
Post-Bid
$19,000,000 est. value
Aurora, CO 80010

Gun Club Road Pump Station Major Improvements Project
Results
$5,000,000 to $5,400,000 est. value
Aurora, CO

Lift Station A And Force Main Project
Post-Bid
Northglenn, CO 80241

Ridgegate First Street Lift Station
Results
Lone Tree, CO

The Lakes at Centerra Metropolitan District Lakes Phase 7 Non-Potable Pump House
Post-Bid
Loveland, CO 80537

Oak Grove Elementary School Christmas Break Sewage Lift Station Upgrade Project
Results
Montrose, CO

Waterbury Lift Station 2019 Repairs
Post-Bid
Centennial, CO 80011

Lift Station Upgrades Project in Greenwood Village
Results
Less than $1,544,555 est. value
Greenwood Village, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Last Updated 12/27/2019 04:37 PM
Project Title

Grandview Pump Station Phase I: Building Improvements and/or Phase 2 and Site Improvements Projects

Physical Address View project details and contacts
City, State (County) Durango, CO 81301   (La Plata County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Building improvements include replacement of the membrane roof, exterior wall sheathing, and stucco. Site improvements include sanitary sewer manhole/piping installations, site drainage improvements, concrete walk/gutter, asphalt paving, an MSE retaining wall, and fencing. Contractor may bid on Phase 1 only, Phase 2 only, or both. Construction schedule, Phase 1 or 2 start dates will be determined by spring weather conditions and contractor availability.

Details

Division 03 - Concrete.
Division 06 - Wood, Plastics, and Composites, Sheathing, Moisture-Resistant Sheathing Board.
Division 07 - Thermal and Moisture Protection, Elastomeric Membrane Roofing.
Division 09 - Finishes.
Division 10 - Specialties.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Fences and Gates, Retaining Walls, Reinforced Soil Retaining Walls, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Manholes and Structures, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Utility Drainage Piping.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents