Similar Projects
G.W. Carver Middle School Replacement
New Construction
Conception
Waco, TX

Tennyson Middle School Replacement
New Construction
Conception
Waco, TX

Midway ISD High School CTE Addition
Addition
Post-Bid
Waco, TX 76700

Woodgate Intermediate Renovations Phase 2
Renovation
Post-Bid
Woodway, TX 76712

Robinson Independent School District - Junior High Renovation
Renovation
Results
$363,900 est. value
Robinson, TX 76706

Midway High School CTE Building and AG Science Addition
- 68,100 SF
Construction
$25,000,000 est. value
Waco, TX 76712

River Valley Intermediate School Additions and Renovations
Renovation, Addition - 107,700 SF
Construction
Less than $34,800,000 est. value
McGregor, TX 76657

New Waco High School
New Construction, Infrastructure
Pending Verification
$119,000,000 CJ est. value
Waco, TX 76710

Design-Build Services for Athletic Turf and Track Resurfacing
Renovation
Post-Bid
Valley Mills, TX 76689

Paul Tyson Field Replacement Project
Renovation, Addition
Construction
$6,967,000 est. value
Waco, TX 76710

Midway Independent School District Middle School Renovations Package 1
Renovation - 140,000 SF
Post-Bid
$6,400,000 est. value
Hewitt, TX 76643

Construction Management-at-Risk Services for Technology Data Center
New Construction - 32,260 SF
Construction
$6,000,000 est. value
Woodway, TX 76712

Two New Facilities
New Construction
Post-Bid
Moody, TX

Waco High School Replacement Gmp-1
Renovation - 370,000 SF
Construction
Waco, TX 76710

Waco ISD Carver Middle School Replacement
New Construction - 13,000 SF
Post-Bid
$55,000,000 est. value
Waco, TX 76704

Last Updated 11/21/2022 03:02 PM
Project Title

Waco High School Portables

Physical Address View project details and contacts
City, State (County) Waco, TX 76707   (McLennan County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $238,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 21 2022 this project is in late planning. This project is for Waco ISD to install 2 portable classroom buildings on the Waco High School campus in the existing courtyard. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2,700 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents