Similar Projects
Mallard Creek Wastewater Treatment Plant Ruvi: Bid Packages No. 7A And 7B
New Construction
Bidding
Charlotte, NC

McAlpine Creek WWMF Nutrient Harvesting
Bidding
$13,000,000 est. value
Charlotte, NC

Odor and Corrosion Control Services
Post-Bid
Raleigh, NC 27610

Rehabilitation and Repair of the Headworks Facilities
Post-Bid
Greenville, NC 27834

Wastewater Treatment Plant Improvements - Filter Replacement
Results
$1,200,000 est. value
Hendersonville, NC

Mocksville-Dutchmans Creek WWTP Renovation
Results
$3,300,000 est. value
Mocksville, NC

NC Aquarium at Pine Knoll Shores Wastewater Maintenance
Term Contract
Bidding
Pine Knoll Shores, NC 28512

Industrial Waste Treatment Plant (IWTP) Repairs and Improvements
Post-Bid
$5,000,000 to $10,000,000 est. value
Cherry Point, NC

Black River WWTP Aeration System Replacement
Results
$2,500,000 to $2,649,400 est. value
Dunn, NC 28334

Eastside Wastewater Treatment Plant, PTF Effluent Control Gates
Bidding
Jamestown, NC 27282

Wastewater Treatment Plant Influent and Headworks Screen Upgrades Project
Post-Bid
Clarkton, NC 28433

Northeast Brunswick Regional Wastewater Treatment Plant 2.5 MGD Expansion
Results
Leland, NC

Residuals Management - Wastewater Treatment Division
Post-Bid
Gastonia, NC 28052

Wastewater Treatment Plant Renovation and Hollingsworth Street Wastewater Pump Station Replacement
Results
Less than $835,551 est. value
Bunn, NC 27508

Big Buffalo Water Reclamation Facility Influent Pump Station Flood Prevention Project
Post-Bid
Sanford, NC 27330

Reported 11/15/2019 12:00 AM
Project Title

Smith Creek RRF Influent Screenings, Pumping and Grit Removal Improvements

Physical Address View project details and contacts
City, State (County) Wake Forest, NC   (Wake County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following major items: 1. Influent Screening Structure: A. Demolition of existing bar screens, washer compactors, slide gates and associated electrical and instrumentation B. Installation of two mechanical bar screens, two washer compactors, two stainless steel slide gates and associated electrical and instrumentation C. Concrete repair within the channels D. Misc. metals E. Temporary bypass pumping system 2. Influent Pump Station: A. Demolition of three existing dry well pumps, associated piping and electrical components B. Installation of three submersible wet well pumps, associated piping, electrical and instrumentation C. Concrete baffle wall construction D. Misc. metals E. Temporary bypass pumping system F. Modifications to the existing electrical service to the Pump Station 3. Grit Removal Structure A. Construction of a concrete structure to house new grit removal equipment B. Installation of one stacked tray grit separation unit, two recessed impeller grit pumps and two grit washing units C. Associated piping and pipe fittings D. Heating and ventilation E. Electrical and instrumentation improvements F. Misc. metals 4. Site Work A. Site Piping B. Site Electrical C. Concrete Pavement D. Site grading and seeding

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents