Similar Projects
Low Voltage Contractors
Bidding
Golden, CO

UPS Replacement
Bidding
Golden, CO

Walk In Cooler
Post-Bid
Golden, CO 80401

Uninterruptible Power Supply (UPS) Battery Backup at Arvada Center
Post-Bid
Arvada, CO 80003

SB267 Upgrade HVAC Systems Group Homes Wheat Ridge Regional Center Phases 1 & 2
Results
$750,000 est. value
Wheat Ridge, CO 80033

HVAC System for Academy C-7 Wing, Building 120
Results
Less than $133,000 est. value
Golden, CO 80401

Full and Partial Industrial Boiler Retube/Repair
Bidding
Littleton, CO 80123

General Contractor Services - RC Lockridge Floor, Data, Electrical Upgrades
Post-Bid
Golden, CO 80401

Replace Primary Power Transformers
Results
Less than $460,000 est. value
Golden, CO 80401

Low Voltage Contractors
Post-Bid
Golden, CO 80401

Replace Obsolete Control Lakes Library
Results
$225,000 est. value
Golden, CO 80401

Council Chambers Production Lighting Upgrade
Post-Bid
Arvada, CO 80002

Prequalify Mechanical Contractors - Campus Infrastructure, Cp6 Chiller
Results
Less than $1,372,000 est. value
Golden, CO

Boiler Replacement at Arvada Head Start
Post-Bid
Arvada, CO 80003

Replace Main Electrical Switchgear and Motor Control Center
Results
$400,000 to $450,000 est. value
Lakewood, CO 80203

Last Updated 12/09/2020 04:21 PM
Project Title

Mechanical, Electrical & Plumbing Construction Services

Physical Address View project details and contacts
City, State (County) Golden, CO 80401   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC, Mechanical, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Electrical Work Electrical work will be identified in the Task Order and may include, but is not limited to, work on: • Low voltage systems up to 600 volts, • Medium voltage up to 15KV, • Lighting, alarm, public address systems, • installation/repairs of the 115KV substation at FC • Other work ancillary to the above. Mechanical Work Mechanical work will be identified in the Task Order and may include, but is not limited to, work on: • Heating, ventilation, and air conditioning systems, and associated controls. • Hydronic heating and cooling systems, and associated controls, • Operation of cranes, lifts, and hoists and other work ancillary to the above. Plumbing Work Plumbing work will be specifically identified in the Task Order and may include, but is not limited to, work on: • Plumbing and pipe fitting, • Installation of piping, pumps, valves and associated controls, • Welding, cutting, and brazing, and other work ancillary to the above.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents