Similar Projects
J--Roll Up Door Repair (Va-19-00002257)
Post-Bid
Detroit, MI 48201

Window Replacement Services
Post-Bid
Clinton, MI

Portage City Hall Exterior Window Replacement
Results
Less than $273,000 est. value
Portage, MI

Second Floor Security Doors
Results
Traverse City, MI

Exterior Doors and Frames for School Buildings With Install
Post-Bid
Cedar Springs, MI

New double doors on the Sault Ste. Marie Public Schools
Results
Less than $49,530 est. value
Sault Sainte Marie, MI

Door Security Devices
Post-Bid
Midland, MI

Window Glazing Services
Results
Flint, MI

Window Security Film
Post-Bid
Midland, MI

Z--Replace Windows-Various Buildings 515-14-103
Results
Less than $5,000,000 est. value
Battle Creek, MI 49037

Window Replacement 2019
Post-Bid
Brighton, MI

Lead Hazard Control at 743 Christy
Results
Less than $29,300 est. value
Jackson, MI

Replacing Entrance Doors
Post-Bid
$40,000 to $50,000 est. value
Ida, MI

Window Replacements
Results
Flint, MI

Window Security Film
Post-Bid
Harbor Springs, MI

Last Updated 01/11/2019 03:44 PM
Project Title

Window Replacement

Physical Address View project details and contacts
City, State (County) Lansing, MI   (Ingham County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1. Furnish and install fencing shown and/or specified including but not limited to man gates, swing gates, sliding gates, vinyl inserts, and fencing fabric. Includes all material, labor, accessories, and equipment for a complete installation. 2. Protection and cleaning of walkways, parking lots, drives, etc. during and at the completion of this work. Includes removal of spoils. 3. Field verification of underground piping, electrical conduit, site utilities, etc., prior to digging, trenching, plowing or spading operations. 4. Include all layout, staking, and auger work. 5. Fencing shall not use existing buildings or other existing structures as support. Fencing must be an independent entity.
Details
Division 08 - Openings, Doors and Frames, Windows.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents