Similar Projects
Common Area Carpet
Post-Bid
Alsip, IL

Carpet
Post-Bid
Palatine, IL

CPS Otis ES Hallway Tile Replacement
Term Contract
Results
Chicago, IL 60642

Des Plaines Boardroom Expansion/Renovation Athletic/Theater Wing Flooring Replacement
Term Contract
Results
Arlington Heights, IL

2021 Flooring Replacement
Post-Bid
Park Ridge, IL 60068

N072--Removal and Replacement of Existing Flooring
Term Contract
Results
Chicago, IL 60612

2021 Flooring Renovations
Post-Bid
Matteson, IL 60443

Hay ES Gym Floor
Alteration
Results
Chicago, IL 60651

ACM Removal
Post-Bid
Palos Hills, IL 60465

Cather ES Asbestos Abatement and Flooring Replacement
Alteration
Results
Chicago, IL

Administration Building Flooring
Post-Bid
Riverside, IL

Gym Floor and Bleacher Replacement
Renovation, Alteration
Results
Streamwood, IL 60107

Corridor Floor Polishing
Post-Bid
Cicero, IL

Construction Services for carpet, floor, wood concrete and sub-floor
Alteration
Results
Chicago, IL 60661

Morton College Corridor Floor Polishing
Renovation
Post-Bid
Cicero, IL 60804

Last Updated 06/16/2022 11:06 PM
Project Title

Hubbard High School Floor Tile

Physical Address View project details and contacts
City, State (County) Chicago, IL 60629   (Cook County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Deadline to submit Questions May 31st 2022, 12:00 PM CDT Controls include the containment or removal of all nuisance or noxious dust, vapors, fumes, odors or emissions caused by construction, demolition, renovation, restoration, or related activities including, but not limited to sawing, cutting, grinding, sanding, abrading, sweeping, crushing, scraping, gluing, prying, plowing, heating, finishing, painting, welding, torch cutting or burning, or any other related processes that can create noxious dust, fumes or odors. Provide all labor and materials to complete floor tile (VCT) installation, including all necessary underlayment, base, and thresholds according to CPS Specifications: SECTION 09 65 00 RESILIENT FLOORING SECTION 06 10 00 ROUGH CARPENTRY

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents