Similar Projects
North Shore Terminal Reservoir Phase 2 Expansion Project
Renovation
Design
Orem, UT

Santaquin Zone 11W Tank and Booster Pump CM/GC
New Construction
Bidding
Santaquin, UT 84655

Panguitch City Water Tank Lid Replacement Project
Infrastructure
Bidding
Panguitch, UT 84759

Zone D - 5 Million Gallon Tank
Post-Bid
$5,000,000 to $6,000,000 est. value
Salt Lake City, UT

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Public Shooting Grounds Wildlife Management Area Concrete Water Control Structures
Infrastructure
Bidding
Corinne, UT

Boulder Farmstead Water Company Water Tank
Post-Bid
Less than $510,000 est. value
Boulder, UT 84716

Canyon Meadows Water System Improvements
Results
Less than $2,000,000 est. value
Springville, UT

Four (4) 1,000 Gallon Propane Tanks
Post-Bid
Blanding, UT 84511

Wildlife Guzzlers and Cisterns
Term Contract
Results
Salt Lake City, UT 84114

Automated Brine Maker System With Vertical Storage Tanks
Post-Bid
Orem, UT 84057

2020 Lower Water Tank Coating Project
Results
Less than $390,900 est. value
Fruit Heights, UT 84037

Zone 2 and 3 Tanks Project
Post-Bid
Herriman, UT 84096

Last Updated 07/29/2021 07:59 AM
Project Title

500 Gallon Fish Hauling Tank

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes installation of fiberglass - aluminium composite fish transport tank. The composite 500 gallon fish transport tank should have the approximate dimensions of 96" long x 54" wide and 40" high with one 500 gallon tank. The overall length of the tank should not extend past the end of our 111" flat truck bed. This transport tank should be sloped to the discharge gate valve. If possible 3" higher front to outlet and sloped from the sides of the tank to the middle of the tank, 2" higher on the side edges to the middle of the tank.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents