Similar Projects
RFQ - Environmental Services for the Merced to Fresno Project Section
Term Contract
Bidding
Fresno, CA 93721

RFP - Update of the Redding Riverfront Specific Plan and Prepare Environmental Impact Report
Term Contract
Bidding
$1,250,000 CJ est. value
Redding, CA 96001

H335--Palo Alto Elevator Inspection Base +4Oy
Term Contract
Post-Bid
Livermore, Menlo Park, Mountain View, Palo Alto, San Jose, CA 94304

H335--Palo Alto Elevator Inspection Base +4Oy
Term Contract
Post-Bid
Livermore, Menlo Park, Mountain View, Palo Alto, San Jose, CA 94304

Tree Inspection Services
Term Contract
Results
Point Reyes Station, CA 94956

Six Fire Damaged Parks Recovery
Infrastructure
Results
$5,370,000 est. value
Santa Rosa, CA 95403

RFQ - Provide Stormwater Alternative Analysis Feasibility Study Services
Term Contract
Bidding
Long Beach, CA 90802

Water Station 4 Facility Assessment
Infrastructure
Post-Bid
Santa Rosa, CA 95405

SDIA - Airport Administration Building - Testing and Inspection
Infrastructure
Results
San Diego, CA 92108

RFQ Design - OEPM Parkwide Surveillance System
Term Contract
Bidding
$5,396,300 CJ est. value
Los Angeles, CA 90012

Asbestos, Lead And Mold Assessment, Training, And Consultation Services
Term Contract
Post-Bid
San Luis Obispo, CA 93405

State Street Master Plan
Infrastructure
Results
Less than $800,000 est. value
Santa Barbara, CA 93106

RFP - Professional Services Related Janitorial Services for the Desi House
Term Contract
Bidding
Eastvale, CA 92880

College of Alameda Construction Management Services Aviation Modernization Phase 2
Renovation, Alteration
Post-Bid
Oakland, CA 94606

Environmental Services Various Bridge Preventative Maintenance
Infrastructure
Results
$460,625 est. value
Santa Barbara, CA 93101

Reported 10/15/2022 12:00 AM
Project Title

RFP - Structural Integrity Services (Assessment)

Physical Address View project details and contacts
City, State (County) Richmond, CA 94806   (Contra Costa County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids
Project Status Bidding, Request for Proposals (RFPs),
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work will be performed at 2910 Hilltop Drive, Richmond, CA 94806 and the intent of this RFP is to procure services from an organization who will safely assess the attic for structural integrity under loading scenarios detailed. Prepare and provide a health and safety plan including COVID-19 mitigation measures, pertinent contacts for incident reporting and directions to and from the site (2910 Hilltop Drive, Richmond CA 94806) as related to the nearest health facility. Provide all necessary materials, supplies, equipment, services and personnel to adequately carry out or complete the Scope of Services. The attic should be reviewed for structural integrity to ensure it can withstand all reasonable and potential loading scenarios including, but not limited to: live loads, seismic loads and environmental loads such as wind. Prior to the assessment, the selected proposer and WCW will discuss loading scenario details. The most recent attic plan sheets have been uploaded as attachments. A plan review table, 2 chairs and thousands of paper documents will be stored in the space full-time. On average, 1 or 2 people will be in the referenced space for 4 hours per month (expected occupancy: 1 hour per day, likely for only 1 day per week). In the most likely maximum loading scenario (i.e. people relocating cabinets full of documents), 4 people could be in the referenced space for 4 hours in 1 day. This assessment should be provided as a report (.pdf) including analysis required by latest version of the California Building Code, BSE-2E assessments, life cycle information before and after proposed work. The following services are optional and may be selected by WCW in its sole discretion. 3.6.1. As-needed Destructive Testing for the Base Scenario Arrange for on-site destructive testing to occur prior to completion of the final deliverable. This includes pulling all necessary permits, removing portions of structures, obtaining samples and testing them for characteristics that could potentially improve the quality of the final deliverable for the base scenario. 3.6.2. Structural Assessment for an Occupied Office Space Scenario The attic should be reviewed for structural integrity to ensure it can withstand the base loading scenario in addition to employee occupancy of the space for 40 hours per week (8 hours per day for 5 days). Prior to the assessment, the selected proposer and WCW will discuss loading scenario details. 3.6.3. As-needed Destructive Testing for an Occupied Office Space Scenario Arrange for on-site destructive testing to occur prior to completion of the final deliverable. This includes pulling all necessary permits, removing portions of structures, obtaining samples and testing them for characteristics that could potentially improve the quality of the final deliverable for the scenario that includes the base scenario and employee occupancy of the space for 40 hours per week (8 hours per day for 5 days). West County Wastewater District ("WCW") is seeking proposals from qualified firm(s) to provide structural integrity services (assessment) for the Hilltop Admin. Bldg. ("Services"), as further detailed in Section 3, Scope of Services. If approved by WCW's Board of Directors, the successful Proposer will execute an agreement in the form of Attachment A for a one (1) year base term with up to four (4) one year option terms. WCW provides wastewater collection and treatment services to approximately 100,000 residents. WCW is a political subdivision of the State of California and operates as an independent special district. WCW's current political boundaries are comprised of the City of San Pablo, a portion of the City of Richmond, a portion of the City of Pinole, and some unincorporated areas within western Contra Costa County. WCW's system includes 249 miles of gravity sewer pipelines, 17 lift stations, 6 miles of pressurized force mains, and a water quality resource recovery plant with a National Pollutant Discharge Elimination System (NPDES) permitted capacity of 12.5 million gallons per day. The method of contractor selection has not been determined at this time.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents