Similar Projects
Community Center Construction
New Construction
Conception
$8,000,000 est. value
Amherst, NH

Rockingham Road Mixed Use
New Construction
Design
Derry, NH 03038

Social Club
New Construction, Demolition - 4,500 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Manchester, NH 03110

McIntosh Commons
New Construction
Design
Dover, NH 03820

Smyth and Radburn Apartments
New Construction
Pending Verification
Manchester, NH 03104

Dartmouth Mount Support Road Apartments
New Construction
Construction
$50,000,000 est. value
Lebanon, NH 03766

Club Motorsports Park - Phase II
New Construction - 11,880 SF
Construction
$8,000,000 to $10,000,000 est. value
Tamworth, NH 03886

Youth Safe Haven Building
Renovation
Construction
$100,000,000 est. value
Nashua, NH 03060

The Timbers
New Construction
Construction
Manchester, NH 03101

The Rail Yard
New Construction
Design
Concord, NH 03301

Community Center Restroom Remodel
Renovation
Results
Rochester, NH 03867

Last Updated 01/20/2022 09:09 AM
Project Title

Severance Schoolhouse Renovation

Physical Address View project details and contacts
City, State (County) Auburn, NH 03032   (Rockingham County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Strip and re-roof with Certainteed 30-year architectural shingles. Including but not limited to a minimum of 6’ of ice and water shield at each edge, new drip edge, and appropriate roof venting. Include as an add/alternate a cost per sheet of plywood sheathing repair. Remove and replace any deteriorated exterior trim, paint exterior trim. Remove and replace exterior railings, decks, and handicap ramp with Trex or similar materials. Extend roof over front entry to a minimum of 5 feet from the building. Remove and replace two side exterior doors, all interior doors, and wood trim as needed. Remove one interior partition. Install appropriate framing as necessary so two rooms become one. Approximately 14’ opening. Provide and install new 6’ run of casework including a sink. New sheetrock, insulation, and drywall finish throughout the interior as needed. Complete interior painting including primer as needed, two coats of finish. Rough and finish plumbing for two new ADA bathrooms, kitchen sink and mop sink. Evaluate the heating system and repair as necessary. New distribution as needed. Add cooling to HVAC system. New electrical and lighting as required throughout. New emergency lights. New electrical devices throughout. Include appropriate new signage as required by code. Install new auto door operator for front door. Parking lot striping. Re-work and add to existing fire alarm system as needed. 12 mm LVT flooring throughout, vinyl cove base with walk-off mat at entry. Dumpster for disposal of all demolition.

Details

Clubhouse/Social Club, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents