Similar Projects
Last Updated | 10/09/2019 10:01 AM |
Project Title | Explosive Ordinance Disposal Technical Facility, Picatinny Arsenal, New Jersey |
Physical Address | View project details and contacts |
City, State (County) | Picatinny Arsenal, NJ (Morris County) |
Category(s) | Government/Public, Green Building |
Sub-Category(s) | LEED Certified, Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 to $100,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The U.S. Army Corps of Engineers, New York District intends to issue a solicitation package seeking to award a firm fixed-price construction contract through the one-step Request for Proposal, Low Price Technically Acceptable solicitation process for the following scope of work: Construction of an Explosive Ordnance Technical facility comprised of a munitions disassembly structure (9,384 sf), field operations, maintenance/experimentation structure (12,816 sf), five (5) earth covered magazines and a storage shed. Interior facilities program will include a weapons firing tunnel with bullet catch system; high explosive material handling observation rooms; command and control room; and weapon and fuse disassembly area. The scope includes lightning protection, mass notification, information systems, fire protection and alarm systems (including ultra-high speed deluge system), Electronic Security System (ESS) installation, duress alarm, Closed Circuit Television (CCTV) installation, and Energy Monitoring and Control Systems (EMCS) connection. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, fencing, gates, storm drainage, information systems, landscaping and signage. Existing building demolition requires mold, asbestos and lead paint abatement. Access for individuals with disabilities will be provided. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Construction will comply with EPAct 2005, EISA 2007, Executive Orders (EO) 13423 and 13514, and other current policies and directives on energy and water conservation. This project will achieve GBCI level certification at the LEED-NC/MR silver level and will follow the guidance detailed in the Sustainable Design and Development Policy. | ||||||||||||||||||||||||||||||||||||
Details | 1 Military Facility, 12,816 SF New Construction.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |