Similar Projects
I 495 Pavement Rehab Ex 32 to 48
Infrastructure
Conception
$35,000,000 est. value
Old Westbury, NY 11568

NY 226 / Sonora Brook- Bridge Deck Replacement Bin 1042040
New Construction, Alteration
Design
$2,650,000 est. value
Bradford, NY

Rt 97 Slope Stabilization
Infrastructure
Design
$2,500,000 est. value
Callicoon, NY 12723

Crack Sealing and Mastic, Various
Infrastructure
Bidding
$1,500,000 est. value
Goshen, NY

Crack Sealing and Mastic, Various
Infrastructure
Bidding
$1,500,000 est. value
Goshen, NY

Rensselaer Pedestrian Safety Improvements
Post-Bid
$300,000 to $350,000 est. value
Rensselaer, NY

Micro Surfacing 2021-2022
Term Contract
Post-Bid
NY

CR252 (Knox Cave Road) Highway Improvement
Results
Knox, NY 12107

Cottage-Magnolia Street Rehabilitation
Results
Less than $2,561,000 est. value
Rochester, NY 14614

University Avenue Multi-Residential
New Construction, Infrastructure - 31,271 SF
Design
Less than $8,500,000 est. value
Bronx, NY 10453

Improvements to South Ferry Dock, NY Route 11
Infrastructure
Bidding
$1,500,000 est. value
Sag Harbor, NY 11963

Vendor Placed Pavement
Post-Bid
Elmira, NY

East Main Street Reconstruction - North Goodman Street to Culver Road
Results
Less than $7,770,000 est. value
Rochester, NY 14614

Roosevelt Drive Corridor Improvements
Infrastructure
Bidding
$2,314,045 to $3,130,770 est. value
Queens, NY

Chateaugay Fish Hatchery Repaving
Post-Bid
$300,000 to $400,000 est. value
Chateaugay, NY

Last Updated 06/27/2022 08:18 AM
Project Title

2022 Paving

Physical Address View project details and contacts
City, State (County) Coxsackie, NY 12051   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sunset Boulevard: Beginning at Washington Avenue to Bailey Street. 3,060' x 31'. The project shall include the following: Milling the entire road down 1.5 inches. 1. Milling keyways, driveways and intersecting roads. 2. Cleaning and preparing the roadway for paving. 3. Laying down tack coat before paving. 4. Furnishing and installing 1.5 inch, type 6 top course. 5. Paving and tying in all blacktop driveway aprons. 6. Supplying and installing all manhole, valve and catch basin extensions. 7. The Village of Coxsackie will provide traffic control by closing roads down. The Village will also provide assistance with trucking to haul out all millings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents