Similar Projects
Trailside at Everett Park Phase II
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
South Haven, MI 49090

I-94 Interchange Rebuild - Michigan Department of Transportation
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Paw Paw, MI 49079

Paw Paw Public Schools 2022 Bond - High School Multipurpose Space
Addition, Demolition, Infrastructure
Design
$8,640,000 CJ est. value
Paw Paw, MI 49079

Paw Paw Public Schools 2022 Bond - High School New Stadium
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Paw Paw, MI 49079

Industrial Park Drive Reconstruction Project
Alteration
Post-Bid
Bangor, MI

Parking lot Sealing and Repairs
Infrastructure
Post-Bid
$50,000 est. value
Lawton, MI

0.52 Mi of Hot Mix Asphalt Crushing, Shaping and Resurfacing, Concrete Curb and Gutter, Storm Sewer and Pavement Markings on Pine Street From Main Street to the North Village Limits of Breedsville
Infrastructure
Results
MI

0.50 Mi of Hot Mix Asphalt Cold Milling and Surfacing, Shoulders, Concrete Sidewalk and Ramps and Pavement Markings on Saint Joseph Street From Paw Paw Street to the East Village Limits in the Village of Lawrence
Infrastructure
Results
MI

Overton Redevelopment Project - City of South Haven
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
South Haven, MI 49090

2023 Bond - Bangor Public Schools
Renovation, Infrastructure
Pending Verification
$7,250,000 CJ est. value
Bangor, MI 49013

Paw Paw Public Schools 2022 Bond - Middle School Major Construction
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Paw Paw, MI 49079

Wastewater Treatment Plant Improvements
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Paw Paw, MI 49079

1.79 Mi of Hot Mix Asphalt Cold Milling and Resurfacing and Pavement Markings on Two Ramps at i-196 Exit 13 (32nd Street) and Exit 18 (m-140)
Infrastructure
Results
MI

Center Street Redevelopment Project
New Construction, Infrastructure - 94,380 SF
Pending Verification
$26,000,000 CJ est. value
South Haven, MI 49090

Consumers Credit Union / South Haven
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
South Haven, MI 49090

Last Updated 02/16/2024 03:17 PM
Project Title

2024 TIFA Sidewalk Project

Physical Address View project details and contacts
City, State (County) Hartford, MI 49057   (Van Buren County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2025
Bids Due View project details and contacts
Estimated Value $116,483 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Contractor shall be responsible for all necessary barricades and have enough barricades on the job to direct traffic (either pedestrian or driven) around the newly poured concrete. Caution tape is not considered to be a barricade and is not acceptable as barricade substitutes. B. If necessary, the Contractor shall provide continuous on-site inspection of the newly poured concrete until it is set to a point beyond potential damage by vandals. C. The work will consist of saw cutting and/or removing existing concrete, asphalt, topsoil, tree roots or other objects in the way of the designated line and grade of the proposed concrete. The Contractor shall be responsible for having a mechanical plate tamper on-site and he shall firmly compact each surface upon which concrete is to be poured with that tamper. The Contractor shall saw cut existing concrete edges as indicated at each job site. Broken existing edges shall not be acceptable. The estimated budget is $40,000. Major items include approximately 12,000 square feet of sidewalks within the City of Hart along with associated saw cutting, concrete removal, grading to blend to surrounding lawns and surfaces, topsoil, seed and mulch. The Contractor shall be responsible for all necessary barricades and have enough barricades on the job to direct traffic (either pedestrian or driven) around the newly poured concrete. Caution tape is not considered to be a barricade and is not acceptable as barricade substitutes. If necessary, the Contractor shall provide continuous on-site inspection of the newly poured concrete until it is set to a point beyond potential damage by vandals. The work will consist of saw cutting and/or removing existing concrete, asphalt, topsoil, tree roots or other objects in the way of the designated line and grade of the proposed concrete. The Contractor shall be responsible for having a mechanical plate tamper on-site and he shall firmly compact each surface upon which concrete is to be poured with that tamper. The Contractor shall saw cut existing concrete edges as indicated at each job site. Broken existing edges shall not be acceptable. The City of Hart reserves the right to accept or reject any bid under these terms. The City of Hart shall not pay for cold weather protection or cold weather additives to the concrete. All work shall be completed prior to the necessitated use of these items. The Contractors shall in general be required to have installed or begun installation of assigned jobs within two months of the receipt of Notice of Award and all work shall be completed and billed to the TIFA by November 30, 2024. Selected Contractor shall submit a bid bond or cashier's check in the amount of five percent (5%) of the total proposed value made out to the City of Hart. This value will be forfeited by the proposer should the selected firm fail to execute the contract. The contract may be extended for one additional year at the same per unit prices if it is mutually agreeable to both the Contractor and the City of Hart and/or Hart TIFA. Such an extension shall be subject to City of Hart and/or TIFA approval prior to commencement of work for the 2025 Calendar Year which will begin after January 1, 2025 and end December 31, 2025. If you have any questions, please contact Nichole Kleiner at (231) 923-0920, nkleiner@cityofhart.org

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents