Similar Projects
Ferst Drive Corridor Realignment
Infrastructure
Bidding
$9,654,000 to $10,846,000 est. value
Atlanta, GA

Milling, Inlay and Plant Mix Resurfacing on SR 5
Infrastructure
Bidding
$5,000,000 est. value
Marietta, GA 30008

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Dekalb Avenue Safety Improvements
Post-Bid
GA

Wyckoff Front Gate Improvements Project
Results
Less than $545,900 est. value
Marietta, GA 30066

LMIG Street Resurfacing
Results
Less than $361,228 est. value
Kennesaw, GA 30144

Milling, Inlay, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 139
Infrastructure
Bidding
$2,000,000 est. value
Mableton, GA 30126

Truck Bay Asphalt Repaving Project at Marietta Power and Water Warehouse
Infrastructure
Post-Bid
Marietta, GA 30060

Third Army Road Area Infrastructure Improvements
Results
Less than $2,800,000 est. value
Acworth, GA 30101

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

T32-D7-PCC Spall Repair-113843
Results

T32-D7-PCC-I285 MP3 to 17.5-130379
Infrastructure
Post-Bid

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

T32-D7-PCC-I75 NB-SB-MP267-MP270 - 130430
Infrastructure
Post-Bid
GA

LMIG Street Resurfacing
Results
College Park, GA 30337

Last Updated 05/28/2022 03:34 AM
Project Title

South Barrett Reliever Phase 3

Physical Address View project details and contacts
City, State (County) Marietta, GA   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The South Barrett Reliever, Phase 3 consists of the extension and widening of Shiloh Valley Drive/Greers Chapel Drive across I-75, tying into the existing Roberts Court at a new roundabout east of I-75, and terminating at the intersection of Roberts Court and Barrett Parkway. The project includes the widening and realignment of Shiloh Valley Drive, Greers Chapel Drive and Roberts Court to create a four-lane roadway with a raised median, curb and gutter, sidewalk and bike lanes north to its intersection with Ernest Barrett Parkway. Also included is the construction of a bridge with no interstate access over I-75. Project is approximately 0.89 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents