Similar Projects
Closed-Circuit Television (CCTV) Storm Drain Pipe Inspection on an Annual Contract
Term Contract
Results
Less than $67,500 est. value
Lawrenceville, GA

209 King Arthur Drive Storm System Improvement
Post-Bid
Lawrenceville, GA 30046

Trenchless Stormwater Pipe Rehabilitation on an Annual Contract
Term Contract
Results
Less than $5,140,939 est. value
Lawrenceville, GA 30046

Henry Terrace Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

241-301 Hanarry Drive (North) Storm Drain System Replacement Project
Post-Bid
Lawrenceville, GA

Cured-In-Place Storm Pipe Relining Project
Results
Norcross, GA 30071

Stormwater Infrastructure Replacement Projects on an Annual Contract
Term Contract
Results
Less than $5,000,000 est. value
Lawrenceville, GA

Church Street Stormwater Improvements CDBG
Bidding
Buford, GA 30518

105 Grayland Place Storm Drain Improvement Project
Post-Bid
Lawrenceville, GA

1021 Stone Mill Way Storm Drain Outlet Protection
Post-Bid
Lawrenceville, GA 30046

1140 Grayland Hill Trail Storm Drain Replacement
Post-Bid
Lawrenceville, GA

1291 Creek Wood Cove Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

363 Downing Street Storm Drain Repair Project
Post-Bid
Lawrenceville, GA

1291 Creek Wood Cove Storm Drain System Replacement
Post-Bid
Lawrenceville, GA

181 Hanarry Drive and Blake Court Storm Drain System Replacement Project
Post-Bid
Lawrenceville, GA

Reported 04/13/2019 12:00 AM
Project Title

650 Hurricane Shoals Road Storm Drain Replacement

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1.Demolition and removal of existing storm system. 2.Installation of a new storm drain system and pre-cast inlets concrete structures. 3.Installation of sod/mulch on areas disturbed by construction activities including erosion control. 4.Site clearing, light grading, excavation and backfill.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents