Similar Projects
Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$990,000 CJ est. value
White River Township, IN 46142

Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$990,000 CJ est. value
White River Township, IN 46142

Commerce Parkway, Arvin Road and Hurricane Street Intersection Improvements
Post-Bid
Franklin, IN 46131

2021 Asphalt Conversion
Post-Bid
IN

2020 CCMG - Full Depth Reconstruction - Pavement Replacement
Results
Greenwood, IN

Intersection Improvement
Results
IN

South State Street Improvements
Post-Bid
$150,000 est. value
Franklin, IN 46131

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Alley Improvements
Post-Bid
Franklin, IN 46131

Walnut Street Roadway Improvements
Results
Edinburgh, IN 46124

2021 Annual Paving
Post-Bid
Greenwood, IN

2021 Street Improvement Program
Results
Bargersville, IN

2021 Maintenance Improvement Program; Mill and Overlay
Post-Bid
Franklin, IN

2021 County-Wide Road Repair Program
Infrastructure
Results
IN

2021 Road Paving and Repair
Post-Bid
New Whiteland, IN

Reported 07/23/2022 12:00 AM
Project Title

Reconstruction of Alleyway between Baldwin and Carlisle Street

Physical Address View project details and contacts
City, State (County) Bargersville, IN 46106   (Johnson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For the Reconstruction of the Alleyway between Baldwin and Carlisle Street project. The project shall include the installation of a new 8" gravity sanitary sewer from the north end of the alley to the existing sanitary in Harriman Avenue and will run approximately 500 feet. The project also includes the installation of a new 8" water main that will be directional drilled and runs approximately 560 feet to existing water main on Harriman Avenue These new utilities will also include new sanitary service laterals and new water service lines. In addition to the new utilities, the alleyway will also be reconstructed with a full depth asphalt section. All work is specified in the Construction Schedule and Specifications for said project. The Proposal must be made on the forms provided in the Contract Documents. Each bid shall be accompanied by a cashier's or certified check, drawn on an acceptable bank, or an acceptable bidder's bond, in an amount not less than five percent (5%) of the total amount of the bid, payable to the Town of Bargersville, Indiana The bidder to whom a contract for work is awarded will be required to furnish a Performance and Payment Bond executed on the specified forms and acceptable to the Town, in the amount of one hundred percent (100%) of the Contract. The bidder must supply all the information required by the bid proposal form. Partial payment will be made monthly based on an approved payment request. The Contractor and all subcontractors will be required to comply with required Federal and State labor regulations including Equal Employment Opportunity, Non-segregated Facilities, and Affirmative Action requirements. The Town of Bargersville, Indiana, reserves the right to reject any and all proposals or parts there-of and to waive all responsibility for irregularities in bids. Bids may be held by the Town of Bargersville, Indiana, for a period of not to exceed sixty (60) days from the date of the opening of the bids for the purpose of reviewing the bids and the investigation of the qualifications of bidders, prior to awarding of the Contract.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents