Similar Projects
Browns Summit Middle School - Roofing Project
Post-Bid
Browns Summit, NC 27214

Roofing Repairs and Maintenance
Post-Bid
Greensboro, NC 27401

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing MACC
Post-Bid

Roof Replacement for Massachusetts Cottage at Charlotte Hawkins Brown Museum
Term Contract
Results
Sedalia, NC 27342

Gtcc – Davis Aviation Center Roof Coating
Post-Bid
Greensboro, NC

Fire Station 1 Roof Replacement
Results
$49,500 est. value
High Point, NC 27262

Roofing Repair and Maintenance
Post-Bid

Auxiliary Gym Roof Replacement for Dudley High School
Results
Greensboro, NC 27401

2020 Roof Replacement - Welborn Middle School
Results
$274,000 est. value
High Point, NC 27265

Roof Replacement - HPHA Main Office
Results
High Point, NC 27260

Astor Dowdy Towers Roof Replacement
Results
High Point, NC

Rooftop Unit Replacement and Installation - 21
Results
Greensboro, NC 27412

Rooftop Unit Replacement and Installation - 21
Results
Greensboro, NC 27403

Last Updated 09/21/2020 10:50 AM
Project Title

Astor Dowdy Towers Roofing and Elevator

Physical Address View project details and contacts
City, State (County) High Point, NC 27260   (Guilford County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The roofing contractor will replace the high-rise upper roof, central roof, and Community Center roof of the Astor Dowdy Towers building. This includes removing existing roof surfaces and insulation down to the existing roof decks and installing new R-30 insulation, 60-mil membranes, and underlayment. The roofing contractor will provide and install new coping and/or edge metal to match existing applications and, once new roofing is installed, conduct a leak test for the Contract Administrator and HPHA to demonstrate that there is no leaking or ponding. The electrical contractor will upgrade the building electrical system by replacing a short-circuited busbar, installing new electrical feeders from the rooftop elevator service room to the basement main distribution panel, and demolishing and replacing the electrical pane! in the elevator service room.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents