Similar Projects
Plans for Construction of Baker Road Sidewalk Extension
Bidding
TX

Greenwind Chase Drive Sidewalk
Bidding
Houston, TX 77094

Sidewalk Improvements - Phase II
Post-Bid
Channelview, TX

Sidewalk Repairs and Richmond Avenue Median Curb Improvements
Post-Bid
$500,000 to $1,000,000 est. value
Houston, TX 77000

New Front Easement Reconnections
Results
Less than $1,875,000 est. value
Houston, TX

Safe Sidewalk Program
Results
$1,200,000 est. value
TX

Houston Bikeway Work Order Project
Bidding
$1,500,000 est. value
TX

2020 Annual Sidewalk Improvements
Post-Bid
Pasadena, TX 77506

Citywide Work Orders for CDSF Projects 2
Results
$3,250,000 est. value
TX

Surface Repair of Red Bluff Hike and Bike Trail
Post-Bid
Pasadena, TX 77501

Citywide Work Orders for CDSF Projects 3
Results
$4,250,000 est. value
TX

Intramural Gravel Lot Conversion
Post-Bid
Houston, TX 77204

Northgate Crossing Blvd Sidewalks, Pedestrian Lighting, Landscaping and Irrigation Improvements
Results
Spring, TX 77373

Elyson Overflow Channel South Trail Landscape
Post-Bid
Houston, TX 77002

Parking Lot LPHS - Construction
Results
La Porte, TX 77571

Last Updated 01/28/2020 07:51 AM
Project Title

Operations Center Building Parking Lot Overlay

Physical Address View project details and contacts
City, State (County) Houston, TX 77054   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $109,707
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The selected contractor will pave the existing asphalt service (approx. 53,000 ft2) and the area that has just been excavated (approx. 4,500 Ft2). 1. Cement stabilize (~4,500 sf) by mixing an average of 35 lbs. Portland cement per square yard into average depth of (6") of existing crushed concrete based areas. Compact the stabilized material and add water to the stabilized base. 2. Mill out (2 layers) existing asphalt at concrete perimeters. 3. Saw cut, break out, and replacement of (~4,100 sf) failing asphalt. 4. Grade, strike off and haul off excess material. 5. Apply SS-1 tack coat to the perimeter edges of the work area.   6. Overlay (~53,300 sf) of parking lot with an average of (2 inches) of Type D Hot Mix Asphalt.   7. Roll and compact the asphalt.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents