Similar Projects
Fuel Farm Aircraft Fueling Facility
New Construction, Alteration - 18,900 SF
Design
Wheeling, IL 60090

2021 Lasalle County Highway Fuel
Term Contract
Post-Bid
Ottawa, IL

2021 Above Ground Fuel Tank
Term Contract
Post-Bid
Richton Park, IL

Installation of One (1) Above Ground Diesel Fuel Storage Tank
Results
Addison, IL 60101

Rehabilitation of the 750,000 Gallon Spheroid High Tank
Results
Carol Stream, IL

Underground Storage Tank System Upgrade
Infrastructure, Alteration
Post-Bid
River Forest, IL

Removal Of Underground Storage Units
Results
Rockford, IL 61109

Southwest 3rd Avenue Natural Gas Replacement
Infrastructure
Post-Bid
Aledo, IL 61231

Underground Fuel Storage
Results
Downers Grove, IL

Gasoline and Diesel Fuel
Infrastructure
Post-Bid
Orland Park, IL

Underground Storage Tank System Upgrade - Transportation Department
Results
Algonquin, Carpentersville, IL 60102

Churchill Woods Fuel Tank Removal and Site Remediation
Infrastructure
Post-Bid
Carol Stream, IL 60188

Automated Gas Kilns
Results
Glen Ellyn, IL

Fuel Site and Storage Tank Inspections and Repairs
Term Contract
Post-Bid
Naperville, IL

Above Ground Tank Purchase and Installation
Infrastructure
Results
Richton Park, IL

Reported 05/04/2022 12:00 AM
Project Title

Fuel Dispenser Relocation

Physical Address View project details and contacts
City, State (County) Decatur, IL 62526   (Macon County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $119,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

To relocate a fuel dispenser at the Macon County Highway Department, located at "2405' North Woodford Street, Decatur, IL 62526.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents