Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Fairview Senior Apartments
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Normal, IL 61761

Caliber Collision
New Construction
Post-Bid
Bloomington, IL 61701

110,000 Gallon Standpipe Rehabilitation
Infrastructure
Post-Bid
$500,000 CJ est. value
Arrowsmith, IL 61722

Division Street Water Main Replacement Project
Infrastructure
Results
$596,181 CJ est. value
Chenoa, IL 61726

2022 Township MFT Construction Sections Martin Township Road District
Infrastructure
Results
$229,144 CJ est. value
Martin Township, IL 61728

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

O'Brien Mitsubishi Sales
Build-Out
Pending Verification
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Love's Travel Stop #867
New Construction - 28,400 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Normal, IL 61761

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

RFQ D/B - Fire Station 2
New Construction, Infrastructure
Post-Bid
$4,750,000 CJ est. value
Normal, IL 61761

Karr Street Reconstruction
Infrastructure
Post-Bid
$1,834,395 CJ est. value
Heyworth, IL 61745

Bloomington Normal Water Reclamation District 51 Inch Main Interceptor Sewer Cleaning
Infrastructure
Post-Bid
$70,000 CJ est. value
Bloomington, IL 61701

Last Updated 10/26/2022 07:36 AM
Project Title

Construct Vehicle Maintenance Shop Phase 1

Physical Address View project details and contacts
City, State (County) Bloomington, IL 61701   (McLean County)
Category(s) Commercial, Green Building, Heavy and Highway
Sub-Category(s) Gas Station, LEED Certified, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $17,811,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Single Prime Bid, PLA, Davis-Bacon Act, FEP Goals and LEED Silver are applicable to this project. Federally Funded Project.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents