Project Title | Rails To Trails Phase IV |
Physical Address | View project details and contacts |
City, State (County) | Hamilton, GA (Harris County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor must furnish the labor, tools, materials, equipment, etc., necessary to install the trail and bridge improvements as shown on the construction plans. More specifically, the work shall consist of grading for the trail path, ± 3,916 TONS of aggregate base for trail and shoulder construction,± 802 TONS of asphalt for a 10- foot wide, 8,725-foot long trail along an abandoned railroad bed, rehabilitation of the existing railroad bridge over US Hwy 1/GA Hwy 27, and all other appurtenances necessary to complete the project in accordance with the specifications and construction drawings. Time allotted for completion of work is 180 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) contract. The GDOT Standard Specifications, 2013 Edition, GDOT Supplemental Specifications Book, 2016 Edition, and applicable special provisions and supplemental specifications apply to this project. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |