Similar Projects
Repairs and Improvements to the Exterior Envelope and Sprinkler System - General Bid
Bidding
$400,000 est. value
Worthington, MA 01098

Repairs and Improvements to the Exterior Envelope And Sprinkler System - Sub Bid
Bidding
Worthington, MA 01098

Inspection, Testing and Maintenance of the Entire Fire Alarm System-Sub-Bids
Sub-Bidding
Boston, MA

Rondileau Student Union Demonstration Room - Sub Bid
Renovation
Sub-Bidding
$440,000 est. value
Bridgewater, MA

Sprinkler Upgrade
Post-Bid
Less than $72,500 est. value
Acton, MA 01720

Study, Annual Inspections, and Maintenance of the Existing Fire Alarm System
Term Contract
Post-Bid
Less than $40,000 est. value
Westborough, MA 01581

DMH Taunton State Hospital - Goss Building - Fire Protection Upgrade - General Bid
Results
Less than $1,544,455 est. value
Taunton, MA 02108

Fire Protection Sprinkler System Service
Results
Less than $221,850 est. value
Boston, MA

H312--Fire and Smoke Damper Inspection/Testing
Bidding
Boston, West Roxbury, MA 02132

Fire Alarm Testing, Maintenance and Repairs Service Contract
Term Contract
Post-Bid
$36,000 to $50,000 est. value
Middleton, MA 01949

Gas Protection System Replacement, Phase 1 - Deer Island Treatment Plant
Results
Less than $1,150,000 est. value
Winthrop, MA 02152

Fire Alarm and Sprinkler Maintenance
Bidding
Boston, MA

Sprinkler
Post-Bid
Milford, MA

Bemis Water Treatment Plant - Filed Sub Bid
Results
Less than $7,400,000 est. value
Pepperell, MA 01463

Wellfleet Elementary School Fire Protection Upgrades - General Bid
Bidding
Less than $1,100,000 est. value
Orleans, Wellfleet, MA 02667

Last Updated 02/03/2021 09:08 AM
Project Title

Humanities Building Fire Alarm Upgrades Project

Physical Address View project details and contacts
City, State (County) Brockton, MA   (Plymouth County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The project includes all labor, materials, equipment and supervision required for the Humanities Building Fire Alarm Upgrades Project. New work shall include, but not be limited to fire stopping, core drilling, patch and repair.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents