Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Waterway Village Pedestrian Bridge - City of Gulf Shore
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Gulf Shores, AL 36542

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

Gulf Shores Justice Center
New Construction, Infrastructure
Bidding
$27,000,000 CJ est. value
Gulf Shores, AL 36542

Fairhope Working Waterfront and Greenspace Project
Infrastructure
Bidding
$5,500,000 CJ est. value
Fairhope, AL 36532

Country Club Drive Water Main Replacement Phase A- Wedgewood Drive to Fairway
Infrastructure
Post-Bid
$300,000 CJ est. value
Daphne, AL 36526

Site Development and Construction of East Terminal Building at H.L. "Sonny" Callahan Airport
New Construction, Infrastructure
Post-Bid
Fairhope, AL 36532

Metal Buildings for the Robertsdale Public Works Complex
New Construction, Infrastructure
Results
$933,109 CJ est. value
Robertsdale, AL 36567

Lakeside Cabins at Lake Shelby New Build
Renovation
Results
$90,000 est. value
Gulf Shores, AL 36542

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Kinderkids Daycare
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Daphne, AL 36526

Palmetto Ridge Townhouses
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Gulf Shores, AL 36542

Harbor Club Condominiums / Orange Beach
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Orange Beach, AL 36561

West 20th Avenue / West 1st St Intersection - City of Gulf Shores
Infrastructure
Conception
$700,000 CJ est. value
Gulf Shores, AL 36542

Last Updated 10/02/2023 09:05 AM
Project Title

Comfort Station

Physical Address View project details and contacts
City, State (County) Foley, AL 36535   (Baldwin County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the construction of a new restroom building within John B. Foley Park including all electrical and utility tie-ins and abandoning of utilities for the old bathroom. For the project area, the scope will include construction and facility operations during occupancy. Desired Construction Start: Not later than 7 calendar days after Notice to Proceed. Required Substantial Completion Date: Not later than 105 calendar days from Notice to Proceed. Required Final Completion Date: Not later than 120 calendar days from Notice to Proceed. Last Request for Information Due: 3 days prior to due date of bids Availability of Documents: Complete sets of procurement documents may be obtained: 1. By contacting Rachel Keith at rkeith@cityoffoley.org or by calling 251-970-2418. Liquidated damages for non-completion of the work within the time limit agreed upon will be assessed in the amount of Two Hundred and Fifty Dollars ($250.00) for each day that the work remains uncompleted. The Owner reserves the right to change the schedule or terminate the entire procurement process at any time

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents