Similar Projects
Luxury Apartment Tower
New Construction - 275,000 SF
Conception
$10,000,000 CJ est. value
Indianapolis, IN 46204

Mixed-Use Development
New Construction - 35,000 SF
Conception
$60,000,000 est. value
South Bend, IN 46601

Tailor Row
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Hammond, IN 46320

Subdivision - Goodwill Store
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Crown Point, IN 46307

Intersection Improvement With Added Turn Lanes
Infrastructure
Bidding
$3,454,791 CJ est. value
Gary, IN 46403

Road Reconstruction
Infrastructure
Bidding
$2,941,000 CJ est. value
Huntertown, IN 46818

Wellness Center - Center Grove Community School Corporation - Structural Steel (BP#02)
New Construction, Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Greenwood, IN 46143

Union Center Elementary School Additions and Renovations - Rebid
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$5,156,852 CJ est. value
Valparaiso, IN 46385

Site Improvements and Related Work at Various Locations
Post-Bid
IN

Demolition and Lot Restoration for Neighborhood Code
Infrastructure
Results
Fort Wayne, IN

Clark-Floyd Landfill Drainage And Work Platform Earthwork
Infrastructure
Results
$750,000 to $1,250,000 est. value
Borden, IN 47106

Woodfield Pointe
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
Greenfield, IN 46140

Indianapolis Academic Health Center Medical Education and Research Facility
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Indianapolis, IN 46202

Woods Robinson Briggs
New Construction, Infrastructure - 318,000 SF
Pending Verification
$100,000,000 CJ est. value
Westfield, IN 46074

RFP Engineering - Morgan County Board of Commissioners Bridge Replacement 49 on Abraham Road
Demolition, New Construction, Infrastructure
Pending Verification
$5,293,000 CJ est. value
Washington Township, IN 46151

Last Updated 05/09/2023 03:02 PM
Project Title

Angola High School Locker Rooms and Tennis Improvements Rebid

Physical Address View project details and contacts
City, State (County) Angola, IN 46703   (Steuben County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Project includes The construction of two (2) new freestanding sports locker room structures; one (1) is a single-story football locker room building (approximately 15,000 square feet) and one (1) is a baseball/softball locker room building (approximately 2,500 square feet). The project also includes construction of an approximately 275 car parking lot and construction of new discus courts and shot-put courts, in addition to the construction of a 2-story covered pavilion and fencing replacement at the existing tennis courts. Project consists of 3 Prime Bidders General Trades Mechanical Electrical Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount. Bid security shall be a certified check or bid bond and shall be the bidder's guarantee that said bidder will, if the contract is awarded to said bidder, execute within ten (10) days of acceptance of his bid, a Contract for the work bid upon. All bid bonds shall be made payable to the Owner and be executed by a surety company authorized to do business in the State of Indiana. No bids may be withdrawn for a period of 60 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. The successful bidders will be required to furnish Performance and Payment Bonds for one hundred percent (100%) of their contract amount prior to execution of contracts. Bonds shall be in full force and effect for a period of at least 12 months after the date of final completion and acceptance of the longest guarantee provided under the contractor's contract. Should the contractor's bonding company default; the contractor will be responsible for securing a new bond within fourteen (14) calendar days.

Details

17,500 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents