Similar Projects
Private Sewer and Water Service Replacement West Street
Bidding
$150,000 est. value
Beaver Dam, WI 53916

Forest Avenue Reconstruction
Bidding
West Bend, WI

2020 Sewer Televising
Post-Bid
Menasha, WI

On-Call Construction Services for Sewer Repair and Rehabilitation
Term Contract
Post-Bid
Milwaukee, WI

2020 Utility Replacements
New Construction, Renovation
Results
Sturgeon Bay, WI 54235

East Side Interceptor and MMSD PS 17 Force Main Relief Phase I
Results
Less than $8,800,000 est. value
Verona, WI

Commercial Street Reconstruction
Bidding
Bangor, WI 54614

2021 Lateral Replacement
Post-Bid
Two Rivers, WI

Sanitary and Storm Relays
Results
West Allis, WI 53214

2021 East Rio Street Utilities
Bidding
Rio, WI

Sanitary Sewer and Water Main
Post-Bid
Watertown, WI

County Line Road Sanitary Sewer and Water Main Conversion
Results
$1,800,000 to $2,100,000 est. value
Menomonee Falls, WI 53051

2021 Street and Utility Improvements
Bidding
$75,000 to $400,000 est. value
Colfax, WI 54730

Plumbing and Pavement Work
Post-Bid
Appleton, WI 54911

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

Last Updated 03/12/2021 01:09 AM
Project Title

Trenchless Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Beloit, WI   (Rock County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: APPROXIMATELY: 4,047 feet of 8" sanitary sewer with 72 reinstatements and about 300 feet of 36" storm sewer in several locations throughout the City of Beloit using CIPP technology. There are three alternate bids. Alternate bid A includes an additional 911 feet of 8" sanitary sewer, 897 feet of 21" sanitary sewer, 23 additional reinstatements and chemical grouting of joints, voids, and laterals in designated mains. Alternate bid B includes chemical grouting and spray lining of 10 manholes. Alternate bid C is using the method of CIPM to rehabilitate 10 manholes and installing chemical grout

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents