Similar Projects
Two Lane Resurfacing - HAN/ALL-US 224/SR 103-05.25/01.79
Bidding
Bluffton, OH

Two Lane Resurfacing - HAN/ALL-US 224/SR 103-05.25/01.79
Bidding
Bluffton, OH

Simon Kenton School Paving
Post-Bid
Kenton, OH 43326

County Road 155 Hot Mix Paving
Post-Bid
Less than $371,000 est. value
Kenton, OH 43326

Miami-Erie Canal Trail Project - Phase 2
Results
Less than $774,300 est. value
Lima, OH 45801

Minor Reconstruction - US 68-04.70 Arlington Phase 2
Results
Arlington, OH 45814

Microsurfacing - ALL-IR 75-01.00/02.94/04.60
Bidding
OH

County Wide Road Resurfacing Project
Post-Bid
Kenton, OH 43326

Spot Patching / Pavement Repair - CPR FY20
Results
Findlay, Van Buren, OH 45889

Goshen Township Road 245 Resurfacing Project
Bidding
OH

Road 100 Widening and Improvements Project
Post-Bid
Alger, OH 45812

Major Reconstruction - IR 75-15.80 (Part 1 and Part 2)
Results
Beaverdam, Bluffton, OH 45808

Village of Mcguffey 2021 Street Resurfacing Project
Bidding
$205,020 est. value
McGuffey, OH 45859

Jackson Street - Findlay Road Realignment
Post-Bid
Lima, OH

Delphos Pierce Street Pavement Improvements
Results
Less than $175,000 est. value
Lima, OH

Last Updated 06/05/2020 07:52 AM
Project Title

Two Lane Resurfacing - /HAN/All-US 224/SR 103-VAR

Physical Address View project details and contacts
City, State (County) Bluffton, Ottawa, OH 45817 (Allen, Hancock, Hardin, Putnam Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improving Sr 31, Sr 65, Sr 103 And Us 224 In The Village Of Bluffton And Ottawa, Ottawa, Blanchard And Richland Townships, Of Putnam, Hancock, Hardin And Allen Counties, Of Ohio, In Accordance With Plans And Specifications By Resurfacing Existing Routes, Crack Sealing And Related Work. Section Roadway 0001 Line Item Code Quantity Unit Item Description Wt Alt 0001 202e23500 3,962.000 Sy Wearing Course Removed (Wt: Nr) Nr 0002 202e30000 588.000 Sf Walk Removed (Wt: Nr) Nr 0003 202e32000 62.000 Ft Curb Removed (Wt: Nr) Nr 0004 209e72050 23.740 Mile Preparing Subgrade For Shoulder Paving (Wt: 06) 06 0005 608e10000 558.000 Sf 4" Concrete Walk (Wt: 38) 38 0006 608e53020 136.000 Sf Detectable Warning (Wt: 38) 38 0007 623e39500 7.000 Each Monument Box Adjusted To Grade (Wt: Nr) Nr Section Erosion Control 0002 Line Item Code Quantity Unit Item Description Wt Alt 0008 659e00300 6.000 Cy Topsoil (Wt: 46) 46 0009 659e10000 50.000 Sy Seeding And Mulching (Wt: 46) 46 0010 659e20000 0.060 Ton Commercial Fertilizer (Wt: 46) 46 0011 659e35000 1.000 Mgal Water (Wt: 46) 46 0012 832e30000 1,000.000 Each Erosion Control (Wt: 08) 08 Section Pavement 0003 Line Item Code Quantity Unit Item Description Wt Alt 0013 253e02000 160.000 Cy Pavement Repair (Wt: 16) 16 0014 254e01000 222,983.000 Sy Pavement Planing, Asphalt Concrete, 0.5" Thickness (Wt: 13) 13 0015 254e01000 297.000 Sy Pavement Planing, Asphalt Concrete, 1.5" Thickness (Wt: 13) 13 0016 254e01000 442.000 Sy Pavement Planing, Asphalt Concrete, Variable Thickness (Wt: 13) 13 0017 254e01600 4,474.000 Sy Patching Planed Surface (Wt: 16) 16 0018 304e20000 95.000 Cy Aggregate Base (Wt: 09) 09 0019 407e20000 19,902.000 Gal Non-Tracking Tack Coat (Wt: 10) 10 0020 423e00100 15,432.600 Lb Crack Sealing, Type i (Wt: Nr) Nr 0021 441e10000 9,892.000 Cy Asphalt Concrete Surface Course, Type 1, (446), Pg64-22 (Wt: 10) 10 0022 441e50200 178.000 Cy Asphalt Concrete Intermediate Course, Type 1, (448) (Wt: 10) 10 0023 617e10100 1,547.000 Cy Compacted Aggregate (Wt: 06) 06 0024 874e20000 58,872.000 Ft Longitudinal Joint Preparation (Wt: 10) 10 0025 875e10000 2,724.000 Lb Longitudinal Joint Adhesive (Wt: 10) 10 Section Traffic Control 0004 Line Item Code Quantity Unit Item Description Wt Alt 0026 618e43000 24.500 Mile Rumble Stripes, Center Line (Asphalt Concrete) (Wt: Nr) Nr 0027 621e00100 773.000 Each Rpm (Wt: 41) 41 0028 621e54000 773.000 Each Raised Pavement Marker Removed (Wt: Nr) Nr 0029 642e00104 27.220 Mile Edge Line, 6", Type 1 (Wt: 45) 45 0030 642e00300 13.730 Mile Center Line, Type 1 (Wt: 45) 45 0031 643e00300 13.350 Mile Center Line (Wt: 45) 45 0032 644e00500 196.000 Ft Stop Line (Wt: 45) 45 0033 644e00600 96.000 Ft Crosswalk Line (Wt: 45) 45 0034 644e00601 66.000 Ft Crosswalk Line, As Per Plan (Wt: 45) 45 0035 644e01000 2.000 Each Railroad Symbol Marking (Wt: 45) 45 Section Maintenance Of Traffic 0005 Line Item Code Quantity Unit Item Description Wt Alt 0036 614e12460 133.000 Each Work Zone Marking Sign (Wt: 39) 39 0037 614e21000 13.730 Mile Work Zone Center Line, Class i (Wt: 39) 39 0038 614e21400 27.460 Mile Work Zone Center Line, Class Ii (Wt: 39) 39 Section Incidentals 0006 Line Item Code Quantity Unit Item Description Wt Alt 0039 103e05000 1.000 Ls Premium For Contract Performance Bond And For Payment Bond (Wt: Nr) Nr 0040 614e11000 1.000 Ls Maintaining Traffic (Wt: 39) 39 0041 624e10000 1.000 Ls Mobilization (Wt: Nr) Nr

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents