Similar Projects
Sawyer Water Purification Plant (SWPP) - Low Lift Pump, Chemical, Garage Roof Project - 38438 - City of Chicago
Renovation
Conception
$10,757,673 CJ est. value
Chicago, IL 60649

Crest Hill Sewage Treatment Plant
Renovation
Design
$200,000 est. value
Crest Hill, IL

Wastewater Treatment Plant Polishing Reactor Improvements
Renovation
Bidding
$1,500,000 CJ est. value
German Valley, IL 61039

RFP Engineering - Combined Sewer Separation, Drainage Improvements and Storm Water Upgrades, Lead Water Service Replacement and Upgrades, and Wastewater Treatment Plant
Infrastructure
Bidding
$3,000,000 CJ est. value
Addison, IL 60101

Concrete Work at Various Locations within the Chicago Metropolitan Area As Required
Term Contract
Sub-Bidding
Chicago, IL 60604

Concrete Work at Bus Turnarounds as Required
Term Contract
Sub-Bidding
Chicago, IL 60604

2021 - Concrete Flatwork
Term Contract
Post-Bid
Richton Park, IL

Portland Cement Concrete Material
Post-Bid
Elgin, IL

Concrete Materials for 2021 Public Works Maintenance
Results
Centralia, IL

Concrete Marquee on Metro Way
Results
Swansea, IL

Roof Replacement of the Lue-Hing M&R Complex Stickney Water Reclamation Plant
Renovation
Bidding
$8,376,000 CJ est. value
Cicero, IL 60804

Furnishing and Delivering Polymer
Term Contract
Sub-Bidding
$11,357,450 CJ est. value
Chicago, IL 60604

Furnishing Class SI Concrete
Post-Bid
Robinson, IL

El Paso Gridley #11 JHS - Early Precast Concrete
New Construction - 80,000 SF
Results
Gridley, IL 61744

Rehabilitate Overhead Air Main at the Calumet Water Reclamation Plant
Renovation
Bidding
$420,000 CJ est. value
Chicago, IL 60628

Last Updated 08/09/2022 03:04 PM
Project Title

Village of Stockton Wastewater Treatment Facility Improvements - Phase 2

Physical Address View project details and contacts
City, State (County) Stockton, IL 61085   (Jo Daviess County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Concrete, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $17,160,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: Construction of the Main Building, Anaerobic Tank, Oxidation Ditch, Final Clarifier, UV Disinfection Building, Aerobic Digester, and associated appurtenances. Project shall be substantially complete within 720 Calendar Days and achieve final completion within 780 calendar days. No bidder may withdraw his bid within 60 calendar days after the actual date of the opening thereof. Federal Davis Bacon Wage Rates: Federal wage rates can be found at portal. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. The applicable wage rates to be used for this project can be found in the specifications or by addendum if the wage determination is updated prior to the bid opening. Wage rates are issued on a monthly basis and monthly revisions are possible. If wage rates are revised in the duration of the project, those are the monthly wages that are applicable. A conditional or qualified BID will not be accepted. "Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Water Pollution Control Loan Program (35 IAC Part 365), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), IL Works Jobs Program Act (30 ILCS 559/20-1), and the "Use of American Iron and Steel" requirements as contained in Section 436 of H.R. 3547, the Consolidated Appropriations Act, 2014. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises (DBEs). The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4." "The contractor shall pay prevailing wages in accordance with the Federal Davis-Bacon wages provision. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the contract documents must be paid on this project, and that the contractor must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex or national origin." Award will be made to the low, responsive, responsible BIDDER on the basis of the Base Bid. Each BIDDER is responsible for inspecting the site and for reading and being thoroughly familiar with the CONTRACT DOCUMENTS. The failure or omission of any BIDDER to do any of the foregoing shall in no way relieve any BIDDER from any obligation in respect to his BID. Each BIDDER shall supply a list of all subcontractors that submitted proposals and if requested by the OWNER all major material suppliers. Further, the BIDDER agrees to abide by the requirements under Executive Order No. 11246, as amended, including specifically the provisions of the equal opportunity clause set forth in the SUPPLEMENTAL GENERAL CONDITIONS OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents