Similar Projects
Full Depth Reclaim, Mill and Overlay and Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
Sleepy Eye, MN 56085

Full Depth Reclaim, Mill and Overlay and Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
Sleepy Eye, MN 56085

Construction of a National Guard Readiness Center 21-01 - Minnesota Department of Military Affairs
New Construction, Infrastructure
Design
$17,245,000 CJ est. value
New Ulm, MN 56073

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

Grading and Riprap
Infrastructure
Results

Wet Corn Bin and Storage Building
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
New Ulm, MN 56073

Roundabout Construction - TH 14
Infrastructure
Conception
$2,400,000 CJ est. value
New Ulm, MN 56073

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

Mill and Overlay, Cold in Place Recycle, Lighting, Pedestrian Crosswalk Flasher System, Snow Fence, and ADA Improvements 8.423 Miles
Infrastructure
Results

FEMA Shelter
Infrastructure
Post-Bid
$180,000 CJ est. value
Springfield, MN 56087

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

CSAH 9 CIR and Overlay
Infrastructure
Post-Bid
$5,000,000 CJ est. value
New Ulm, MN 56073

CSAH 13 (Boundary Street) New Alignment
Infrastructure
Results
$4,876,835 est. value
New Ulm, MN 56073

Last Updated 04/11/2023 07:08 PM
Project Title

North Highland Ave. and North Broadway Rehabilitation

Physical Address View project details and contacts
City, State (County) New Ulm, MN 56073   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,778,567 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

He Work Includes the Construction of Approximately: Full Depth Reclamation 23250 Sq Yd; Mill Bituminous Surface (2.0") 29069 Sq Yd; Type Sp 9.5 Wearing Course Mixture (3,b) 3977 Ton; Type Sp 9.5 Wearing Course Mixture (3,c) 5487 Ton; Type Sp 12.5 Non Wearing Course Mixture (3,b) 2744 Ton; Concrete Walk 9207 Sq Ft; Concrete Curb and Gutter 1633 Lin Ft; Together With Numerous Related Items of Work, All in Accordance With Plans and Specifications. This Project is Subject to Prevailing Wage Rates, Truck Rentals, Equal Employment Opportunity Provisions, Buy American Iron and Steel Provisions, and Responsible Contractor Certification

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents