Similar Projects
Extra Space Storage
New Construction - 1,350 SF
Conception
Payson, UT 84651

Riverview Plaza & Townhomes
New Construction - 46,114 SF
Conception
$10,000,000 CJ est. value
Saratoga Springs, UT 84045

Vista View Commercial
New Construction
Design
Spanish Fork, UT 84660

Colarusso Industrial Park
New Construction
Design
Provo, UT 84601

Dominion Energy Springville Weld Shop
Renovation - 1,950 SF
Post-Bid
Springville, UT 84663

BSA Orem Office
Renovation - 5,500 SF
Post-Bid
Orem, UT 84057

Office Remodel and Build Out
Renovation, Build-Out
Results
Orem, UT 84058

DFCM Construction - Pre Qualified General - Mtech Provo Office Remodel Phase 2
Results
$1,300,000 est. value
Provo, UT 84601

Sporkland Office Tower
New Construction - 151,592 SF
Construction
$15,000,000 est. value
American Fork, UT

Novolab TI - Wagner Building
Renovation - 2,050 SF
Construction
Lehi, UT 84043

Lindon OW Building 2
New Construction - 74,861 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Lindon, UT

The Hub at Saratoga Springs
New Construction
Pending Verification
Saratoga Springs, UT

Utility Billing Office Remodel
Renovation
Post-Bid
Eagle Mountain, UT 84005

Gunn Office Building
New Construction - 6,438 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Pleasant Grove, UT 84062

Willowbrook Commercial
New Construction
Pending Verification
Spanish Fork, UT

Last Updated 11/03/2021 11:15 AM
Project Title

Summit Ridge Commercial

Physical Address View project details and contacts
City, State (County) Santaquin, UT 84655   (Utah County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Bids by Invitation.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

6 Office, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents