Similar Projects
Rock Island Silicon Plant Redevelopment
Demolition, New Construction, Infrastructure, Build-out
Conception
$20,000,000 CJ est. value
Rock Island, WA 98850

Chief Joseph Dam Debris Boom
Infrastructure
Design
$5,000,000 CJ est. value
Bridgeport, WA 98813

New Fire Station - Beebe Fire Station
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Orondo, WA 98843

C. Kummer Ranch Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Waterville, WA 98858

Public Swimming Pool Rehabilitation Project
Infrastructure
Bidding
$80,000 CJ est. value
Bridgeport, WA 98813

Dollar General #24148 / Bridgeport - Revised
New Construction, Infrastructure - 12,480 SF
Post-Bid
$1,500,000 CJ est. value
Bridgeport, WA 98813

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Pangborn Memorial Airport MALSR Approach Lighting System
Infrastructure
Results
$2,909,713 CJ est. value
East Wenatchee, WA 98802

Bridgeport Animal Barn - Rebid
New Construction, Infrastructure
Results
$918,147 CJ est. value
Bridgeport, WA 98813

Construction of Douglas County Fire District 4 Station 244 - Re-bid
New Construction, Infrastructure
Construction
$1,797,000 CJ est. value
Orondo, WA 98843

Chapacka East Subdivision
New Construction, Infrastructure
Pending Verification
$20,800,000 CJ est. value
East Wenatchee, WA 98802

Northern Fruit Campus
New Construction, Infrastructure
Pending Verification
$201,300,000 CJ est. value
East Wenatchee, WA 98802

Transmission and Distribution Dock Crew
Infrastructure
Bidding
$570,000 CJ est. value
East Wenatchee, WA 98802

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

3rd Street SE and Rock Island Road Intersection Improvements
Infrastructure
Results
$1,177,204 CJ est. value
East Wenatchee, WA 98802

Last Updated 02/20/2023 07:35 AM
Project Title

US 97A/Knapps Hill Tunnel - Illumination Upgrades

Physical Address View project details and contacts
City, State (County) Touhey, WA 98830   (Douglas County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,071,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The illumination system in the Knapps Hill Tunnel is at the end of its useful life and is due for replacement. By replacing existing 480V service and high pressure sodium lighting with 240V service and LED lighting it will reduce electrical and maintenance costs and increase safety for WSDOT employees. As of February 20, 2023, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the fourth quarter of 2022. The contract advertisement is expected in first quarter of 2023 and construction is anticipated to be operationally complete in the second quarter of 2023. WSDOT - US 97A/Knapps Hill Tunnel - Illumination Upgrades *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents